Country |
Client/Finance |
Project |
Services |
Period |
|
Cambodia |
JICA |
Drainage Improvement and Flood Control in the Municipality of Phnom
Penh
Improvement of existing urban drainage and flood control system in
Phnom Penh area.
Component A: Reinforcement of dikes
Kop Srov dike (7.65 km), Tompun dike (4.44 km), Svay Pak drainage
sluiceway (1.5 x 2.0 m)
Component B: Tumpun watershed drainage improvement
Pumping Station (15 m3/s), Meanchey drainage stretch (2.64 km), Tum Mup
Toek drainage sluiceway (10 m3/s), Salang drainage stretch (0.9 km) |
MP, FS
BD |
1997-1999
2001 |
|
Cambodia |
JICA |
Siem Reap Water Supply Project
Comprehensive master plan and feasibility study for water supply for
City of Siem Reap including review of water quality of Ton Le Sap Lake,
West Barai Lake, Ton Le Sap River, and underground water, and out lining
of water supply routes and preliminary design for water supply pipelines
based on the water resource management scheme and demand forecast of
treated water. |
MP, FS |
1996-2000 |
|
Lao PDR |
JICA |
Watershed Management Plan for Forest Conservation in Vangvieng District
Formulation of integrated watershed management plan in Vangvieng
district in order to contribute to the improvement of resources management
and livelihood of the local people. |
MP |
1996-1998 |
|
Lao PDR |
JICA |
Vientiane Area Drainage System Improvement
Improvement of the flood control and drainage system, putting main
focus on inland water drainage in the area surrounded by the Mekong and
Hong Xeng rivers, Wattay Airport and That Luang Marsh (52 km2). |
MP, FS |
1989-1990 |
|
Lao PDR |
UN/UNDP |
Nam Ngum River Basin Development
|
MP, FS |
1959-1964 |
|
Lao PDR |
Japanese Government |
Lower Mekong-Major Tributaries (34 rivers) Reconnaissance Survey
|
S |
1959-1961 |
|
Lao PDR |
UN |
Comprehensive Lower Mekong Development Reconnaissance Survey
|
S |
1956 |
|
Myanmar |
JICA |
Solid Waste Disposal in Yangon City
Assist in formulating solid waste disposal planning in Yangon city. |
S |
2000-2001 |
|
Myanmar |
Government |
Thanintharyi (Tenasserim) River Basin Hydropower Development
Preliminary hydropower potential study for electric power supply
development in the target area. |
S |
1996-1997 |
|
Thailand |
JBIC |
The Environmental Fund Project
This Fund was established to efficiently meet the financial
requirements of the environmental projects across Thailand. Under the
assistance of ODA loans, 24 solid waste disposal projects and 4 waste
water treatment projects have been formulated and approved as
sub-projects.
This study will draw up a project formulation manual for local
municipalities, which are responsible for sub-project formulation, and
screening guidelines for the Ministry of Science, Technology and
Environment, which is responsible for screening projects. The study will
also make proposals on how to address environmental and social
considerations, and invite personnel for training, in an effort to ensure
that the sub projects are executed accurately. |
SAPI |
2001-2002 |
|
Thailand |
JETRO |
Tha Sae-Bang Saphan Water Conveyance Project
The water conveyance pipeline from Tha Sae Dam (under planning) Saphan
Industrial Estate (Total pipeline length: about 70 km). |
FS |
2000-2001 |
|
Thailand |
JBIC |
Tha Sae Reservoir Project
Review and up-grading of the existing project plan in order to prepare
for the project implementation by JBIC loan. The scope of the project is
construction of reservoir (Zoned Earth Fill, H=59 m) in Chumporn Province
to improve water supply to meet the water demand for irrigation and for
industry and to control floods. |
SAPROF |
2000 |
|
Thailand |
JICA |
Sewage Sludge Treatment/Disposal and Reclaimed Wastewater Reuse
Master plan study on sewage sludge treatment and reuse of reclaimed
wastewater in Bangkok Metropolitan area. |
MP |
1998-1999 |
|
Thailand |
JICA |
Kok Ing Nan Water Diversion
Study for construction of water diversion canal and tunnel for 2.5
billion cubic meter volume of water.
The maximum discharge capacity of canal structures would be 175m3/s (River
Training: 50 km, Total Canal Length: 40 km, Total Tunnel Length: 60 km,
Total Irrigation Area: 300,000 ha). |
MP, FS |
1996-1999 |
|
Thailand |
JBIC |
BMA Waste Water Management Project
Survey and investigation for construction of sewerage treatment systems
in Thonburi (51.22 km2) and Khlong Toey (57.15 km2)
districts in Bangkok Metropolitan area. |
SAPROF |
1997-1998 |
|
Thailand |
JICA |
Phukhet Municipality Sewerage and Drainage Improvement
Comprehensive program for improvement and development of sewerage and
storm water drainage system in Phukhet municipal area, and urgent priority
schemes. |
MP |
1989-1990 |
|
Thailand |
Government |
Kong Chi Mun Area Water Resources Development
Multi-regional water resources development in Nong Khai area (13
provinces, 350,000 ha). |
S |
1989-1990 |
|
Thailand |
JICA |
Chao Phraya River Basin Flood Forecasting and Warning System
Development
Basin-wide flood forecasting system
Catchment area: 162,000 km2 |
FS |
1987-1988 |
|
Thailand |
JICA |
Sakae Krang River Basin Development
Basin-wide agricultural development
Irrigation: 46,700 ha, V=2,500,000 m3
Dam: Rockfill
Main canals: 76.7 km |
FS |
1984-1986 |
|
Thailand |
Government/JBIC |
Nong Pla Lai Multipurpose Dam
Dam: Earth-fill, 31 m high, 4,060 m long, 4,000,000 m3 volume
Irrigation: 21,200 ha, Municipal and industrial water supply: 36.2 million
m3/day |
DD |
1984-1985 |
|
Thailand |
JICA |
Nong Kho-Laem Chabang Water Pipeline
Municipal and industrial water supply
1st stage: Pipeline 14.4 km, design water discharge 0.82 m3/s
2nd stage: Pipeline 14.4 km, design water discharge 0.82 m3/s |
FS |
1983-1984 |
|
Thailand |
JICA |
East Coast Multi-Basin Integrated Water Resources Development-Phase II
Long-term and multi-regional water resources development to year 2001.
Irrigation: 16,700 ha in total
3 dams: earthfill, H=20~21 m |
MP, FS |
1982-1983 |
|
Thailand |
Government/Japanese Government |
Southern Thailand Hydroelectric Development Project
|
FS |
1967-1978 |
|
Thailand |
Japanese Government, Mekong Committee |
Lower Mekong River Tributaries Development
|
S |
1958-1961 |
|
Thailand |
UN |
Lower Mekong River Basin Development
|
S |
1956-1958 |
|
Vietnam |
Government/JBIC |
Nhon Trach Water Supply in Dong Nai Province
Water Supply to industrial zone and residence along National Road No.
51 such as: Tam Phuoc, An Phuoc, Long Thanh and Nhon Trach in Dong Nai
Province with capacity of 100,000 m3/day. |
DD, CS |
2000-2004 |
|
Vietnam |
Government/JBIC |
Da Den Dam Water Supply System in Ba Ria-Vung Tau Province
Clean water supply for domestic and industrial use and other business
and services activities in the urban areas and industrial zones in Ba Ria
- Vung Tau province with a capacity of 50,000 m3/day. |
DD, CS |
2000-2004 |
|
Vietnam |
IBRD |
Water Resources Assistance Project
Preparation of three component of the Vietnam Water Resources
Assistance Project(1) Integrated Development of the Thu Bon Basin(2)
Irrigation Modernization(3) Dam Safety Management |
MP, FS |
2002-2003 |
|
Vietnam |
JICA |
Nationwide Water Resources Development and Management
Formulation of master plan for nationwide water resources development
and management including integrated river basin management plan for the
selected 14 major river basins and conducting feasibility study on
priority Projects. |
MP, FS |
2001-2003 |
|
Vietnam |
JBIC
Government/JBIC |
Drainage Project for Environmental Improvement in Hanoi City
Dredging works for 4 major rivers and 4 major lakes, construction of
regulating reservoir (4,000,000m3), 4 water pumping stations (135m3/s), 2
waste water treatment plants, rehabilitation works of existing sewerlines,
etc. for the mitigation of floods and inundation in Hanoi City. |
SAPI
DD, CS |
2000
1997-2003 |
|
Vietnam |
JETRO |
Salt Intrusion Prevention Project in North Ben Tre and Tra Vinh of
Mekong Delta
Feasibility study on Salt Prevention Plan in the downstream area of
Mekong Delta. The purpose of the project is to obtain the geological
conditions of the locations where new hydraulic structures are expected to
construct. |
FS |
2001-2002 |
|
Vietnam |
JICA |
Hydro-Meteorological Monitoring for Water Quality Rules in Mekong River
Basin
Study flow regime of the Mekong River system and assist Mekong River
Commission (MRC) in the processes of the preparation of the draft MRC's
Rules for water quantity/utilization, and strengthen the institutional
framework and capacity of the reparian members and MRCS. |
MP |
2001-2002 |
|
Vietnam |
JICA |
Project for Urgent Equipment Supply for Waste Management in Hanoi City
To prepare a basin plan for the procurement of necessary equipment,
machinery and vehicles for solid waste management in Hanoi City. The
examination of the whole solid waste management process, from collection
to disposal/treatment, is undertaken to this end Environmental/Social
issues are also included in this plan. |
BD |
2001-2002 |
|
Vietnam |
JICA |
Groundwater Development in the Rural Provinces of the Central Highlands
Evaluation of groundwater resources potential in the Study area,
formulation of groundwater development plan and a long-term water supply
plan for target communes in the three (3) provinces of Kon Tum, Gia Lai
and Dac Lac, feasibility study for selected priority projects. |
MP, FS |
2000-2002 |
|
Vietnam |
JICA |
Sanitation Improvement Plan for Haiphong City
Formulation of sanitation improvement plan on water supply, sewerage
(including drainage) and solid waste management system and conducting
feasibility study on drainage and sewerage system and/or solid waste
management system for the priority, project identified in the master plan
study. |
MP, FS |
2000-2001 |
|
Vietnam |
JBIC |
Water Supply Project Along the Route 51 in Southern Vietnam
Review and up-grading of the existing pre-feasibility study in order to
prepare for the project implementation by JBIC loan. The Project features
the construction of water supply pipes from Dong Nai River to Ho Chi Minh
City and surrounding industrial estates, and the dam construction in
Varia-Vung Tau area for water supply for Varia-Vung Tau region. The total
capacity of water supply amounts to 1,700,000 m3/day by the year 2015. |
SAPROF |
1997 |
|
Vietnam |
Private Company |
Industrial Waste Management in Hanoi City
Managing the industrial waste in Hanoi city to cover the future
industrialization.
Project area: Minh Tri in the district of Soc Son, which is situated 40 km
north of the center of Hanoi City. |
S |
1997 |
|
Vietnam |
JICA |
Dong Nai River and Surrounding Basin Water Resources Development
Water resource development of Dong Nai River for 4 principle
tributaries (Be river, Saigon river, La Nga river and Vam Co river) and
adjacent coastal river catchments.
(Study Area: 46,000 km2) |
MP, FS |
1994-1996 |
|
Vietnam |
Government/
Private Company
JICA |
Urban Drainage and Wastewater Disposal Systems in Hanoi City
City-wide drainage and wastewater disposal systems covering an area of
140 km2 including the urbanized area (50 km2) and
its adjoinings (90 km2) in Ha Noi City. |
S
MP, FS |
1991
1993-1995 |
|
Vietnam |
Government |
Song Cai River Basin Development
|
MP |
1973-1975 |
|
Vietnam |
Government/ADB |
Binh Dinh Province Water Resources Development
|
MP |
1966-1967 |
|
Vietnam |
Japanese Government |
La Nga River Basin Development
|
MP |
1964-1966 |
|
Vietnam |
JICA |
Upper Srepok River Basin Development
|
MP |
1961-1966 |
|
Vietnam |
UN |
Upper Se San River Basin Development
|
MP, FS |
1961-1964 |
|
Vietnam |
Government |
Upper Dong Nai River Basin Development
|
S |
1962-1963 |
|
Indonesia |
Government/JBIC |
Ciliwung Cisadane River Flood Control Project
Mitigation of flood damages in the area along the lower reaches of the
Cisadane river by means of the construction of the Ciliwung floodway and
the river improvements of lower reaches of the Cisadane river.
Ciliwung Floodway Tunnel
Length of tunnel: 913 m, Inner diameter of tunnel: 8.0 m, Discharge
capacity: 300 m3/s per 1 channel
Cisadane River Channel
Improvement length: 15 km, Design discharge: 1,500 m3/s for 25 year
probable flood |
DD, CS |
1999-2005 |
|
Indonesia |
JICA |
Study on Flood Control and Water Management in Limboto-Bolango-Bone
Basin
The objectives of the study are:
1) to formulate a master plan of sustainable flood control and water
management plan in Limboto-Bolango-Bone basin,
2) to conduct the feasibility study on the priority projects, and
3) to transfer technology to counterpart personnel in the cause of the
study |
MP, FS |
2001-2002 |
|
Indonesia |
Government/JBIC |
Lower Solo River Improvement
Mitigation of flood damages on the flood prone area, and contribution
to the stability of agricultural production and to accelerate
socio-economic activities in Bojonegoro and Babat area.
River Improvement Works
- Dikes: 492 km
- Revetment: 23,000 m.
- Sluiceway with gates: 250 nos.
- Bridges: 11 new and 7 raising
- Associated roads: 28 km
- Short-cut channel: 1.5 km
North Diversion Floodway (D/D)
Jabun Retarding Basin (D/D) |
DD
FS
CS |
1992-1994
1994
1996-2002 |
|
Indonesia |
Indonesia |
Special Assistance for Project Sustainability for Twenty Four
Infrastructure Rehabilitation Projects (Package A)
Review study of completed infrastructure projects in river improvement
and water resources development sector under the Japanese ODA loan,
formulation of rehabilitation plan, and recommendation on improvement of
maintenance system. |
SAPS |
2001 |
|
Indonesia |
JICA |
Urgent Countermeasures for Sedimentation in Wonogiri Multipurpose Dam
Reservoir
The prime objective of this Project is to decrease sediment influx into
the Wonogiri dam reservoir to retain the reservoir capacity as much as
possible for flood control, and stable water supply for irrigation,
domestic and industrial use and hydropower generation. To this end, the
following 3 components will be examined in this study:
1) Construction of two check dams on the Kali Kuduang just before the
river enters into the reservoir.
2) Sediment dredging in front of the intake. (100,000m3)
3) Supply of a unit of sediment removal system comprising dredger, working
boat, discharge pipes and accessories. |
BD |
2001 |
|
Indonesia |
JICA |
Study on Rural Water Supply in Nusa Tenggara Barat and Nusa Tenggara
Timur
The study aims to formulate a strategy and implementation plan for
rural water supply (groundwater and springs in the area), and to review
and give recommendations on operation & maintenance services for
sustainable water supply management. |
MP, FS, BD |
2001 |
|
Indonesia |
JBIC |
Infrastructure Rehabilitation Projects (Package C)
The purpose of the project is to examine seven projects in the water
resource and irrigation sector and two projects in the port sector. These
were all found to be in need of rehabilitation in the previous study
packages A and B of completed infrastructure projects financed by ODA
loans.
The present study will provide support for adopting specific measures and
putting in place supervisory arrangements in implementing rehabilitation
work aimed at strengthening project operation, maintenance and control. |
SAPS |
2001 |
|
Indonesia |
JBIC |
24 Infrastructure Rehabilitation Projects (Package A)
Some of the infrastructure projects supported by the ODA loans have
been in operation for long periods of time after completion and are in
need of restoration and rehabilitation due to natural disasters and other
reasons. The purpose of the project is to restore and rehabilitate the
existing infrastructure, which is regarded as a priority by the government
of Indonesia.
The study will conduct technical and other examinations required for
rehabilitation work, with regard to the projects supported by ODA loans
and whose need for rehabilitation has been approved. |
SAPS |
2001 |
|
Indonesia |
Government/JBIC |
Study on Policy Reform in Water Resources Sector (WATSAL)
Objectives are to improve national institutional framework for water
resources development and management, organizational and financial
framework for river basin management, regional water quality management
regulatory institutions and implementation, and national irrigation
management policy, institutions and regulations. |
S |
2000-2001 |
|
Indonesia |
Government/JBIC |
Sector Program Loan for Water Resources Development Project
Monitoring services for project implementation and technical services
for design review.
The major objectives of the project are to achieve:
a) tangible and quick effects on employment generation,
b) food security, and
c) protection of socially vulnerable groups caused by economic crisis. |
S, DD, CS |
1999-2001 |
|
Indonesia |
Government/JBIC |
Major and Minor Drainage Improvement Works in Surabaya Urban
Development Project
Drainage improvement for Gurungsari canal and Diversion channel in
Southern and Western part of Surabaya. |
CS |
1994-2000 |
|
Indonesia |
Government/JBIC |
Project Type Sector Loan for Water Resources Development
Evaluation, monitoring, technical assistance and formulation of
possible subsequent project for rehabilitation/completion/upgrading of
medium and small irrigation of 38 schemes, 100,285 ha of village
irrigation schemes, 7 schemes of swamp development, 32 schemes of pond
water resources conservation and 8 schemes of flood control and river
works. |
S, DD, CS |
1997-1999 |
|
Indonesia |
Government/IBRD |
Hydro Inventory and Pre-feasibility Studies
Updated hydroelectric and pumped storage inventories, formulated a long
term strategy for hydro-resource development and identification of
priority schemes. |
S |
1996-1999 |
|
Indonesia |
JICA |
The Study on Comprehensive Management Plan for the Water Resources of
the Brantas River
Formulation of a comprehensive water resources management plan for the
Brantas River basin including a structural development plan for
appropriate water use management.
Catchment area: 11,800 km2
River length: 320 km |
MP |
1996-1998 |
|
Indonesia |
JICA |
Greater Jakarta Urban Drainage and Waste Water Disposal
Improvement of urban drainage and development of integrated sewerage
system in Jakarta metropolitan area.
Study area: 650 km2
Channel Improvement and Construction: 87.5 km
Pump Station Construction: 2 pump stations
Sewerage Development Area: 16,604 ha, 140 villages
Treatment Plant: 6 places, 160 ha (in total) Served Population 6,449,000 |
MP, FS
DD |
1989-1991
1996-1998 |
|
Indonesia |
JICA |
Revision of Jakarta Water Supply Development Master Plan
Review of existing plan and progress of the project for establishing
plan up to year 2019 on water supply project in development Jakarta
Metropolitan Area. |
MP, FS |
1995-1997 |
|
Indonesia |
JICA |
Comprehensive Water Management Plan in JABOTABEK
Preparation of water management plan including flood control for
JABOTABEK area (Jakarta Metropolitan Area, Bogor, Tanggerang, and Bekasi
provinces). |
MP, FS |
1995-1997 |
|
Indonesia |
JICA |
Kampur Indragiri River Basin Integrated Development
Overall development plan of Kampur-Indragiri river basin to year 2019. |
MP, FS |
1993-1996 |
|
Indonesia |
Government/JBIC |
Jakarta Water Supply
Technical assistance in institutional development and project
management for executing detailed design and construction supervision of
water distribution network rehabilitation and in fill extension works. |
DD, CS |
1992-1996 |
|
Indonesia |
Government/JBIC |
East Jakarta Flood Control
Construction of Eastern Banjir canal (upper and middle reaches),
improvement of Buaran river, Terusan Sunter, Marunda drain and Sunter and
Cipinang rivers.
Stage 1
- Eastern Banjir Canal: upper stretch: 5.4 km, design flood: 100-year
- Salinity control barrage: 1 nos.
- Buaran River improvement: lower reaches: 5.6 km, design flood: 25-year
Stage 2
- Eastern Banjir Canal: middle stretch: 8.0 km, design flood:100-year
- Marunda Drain: 5.5 km, Design flood: 25-year
- Improvement of Suntar and Cipinang Rivers: 7 km, Design flood: 25-year
- Tersan Suntar Drain: 7.6 km, Design flood: 25-year |
DD, CS |
1988-1996 |
|
Indonesia |
JICA |
Ciujung - Cidurian Integrated Water Resources Development
Development of water conveyance system to supply domestic and
industrial water to the Jabotabek area from the Ciujung - Cidurian. |
FS |
1993-1995 |
|
Indonesia |
Government/JBIC |
Ular River Basin Flood Control and Improvement of Irrigation Project
Project area: 45,000 ha, Irrigation area: 18,500 ha
Main canal: 46.68 km, Secondary canal: 155 km |
DD, CS |
1991-1995 |
|
Indonesia |
JICA
Government/JBIC |
Upper Solo River Improvement and Madiun River Urgent Flood Control
Improvement of 22 km long section of the Madiun River, improvement of
river sections at the confluence of 4 tributaries, and construction of 3.8
km long short cut channel.
Excavation: 3,793,000 m3, Embankment: 1,882,000 m3, Revetment: 5.9 km,
Drainage Ditch: 59.5 km and
Bridge: 5 nos. |
FS
DD, CS |
1980
1987-1995 |
|
Indonesia |
Government/JBIC |
Porong River Rehabilitation
Improvement and rehabilitation of damaged river structures along Porong
river channel including protection of Porong bridge and improvement of
inspection road.
River channel length: 51 km |
DD, CS |
1989-1994 |
|
Indonesia |
Government/JBIC |
Upper Solo River Improvement
Improvement of Upper Solo river channel (6.2 km) and two tributaries
(8.5 km), construction of 2 short-cut channels (4 km).
Excavation: 2,511,000 m3, Embankment: 898,000 m3, Revetment: 3.7 km,
Drainage ditch: 19 km and
Establishment of flood forecasting and warning system |
CS |
1987-1994 |
|
Indonesia |
JICA
Government/JBIC |
Brantas Middle Reaches River Improvement
Total length: 99 km
1st stage:
Design flood discharge: 1,350 m3/s, river bed dredging: 7,088,000 m3/s,
levee embankment: 516,000 m3/s
2nd stage:
Design flood discharge: 1,500 m3/s, river bed dredging: 7,525,000 m3/s,
levee embankment: 857,000 m3/s, telemeterized flood forecasting and
warning system
Catchment area: 11,800 km2, River length: 320 km |
FS
DD
CS |
1972-1973
1980
1983-1994 |
|
Indonesia |
JICA
Grant
Government/JBIC |
Surabaya River Improvement-Stage I and II
River channel improvement, 5 km stretch for 20-year flood and 19 km
stretch for 5-year flood and rehabilitation of existing 2 dams including
river dredging works. |
MP, FS
DD, CS
FS
DD, CS |
1971-1973
1975-1981
1979
1988-1994 |
|
Indonesia |
JBIC |
Brantas River Basin Water Resources Development Project
Evaluation of pertinency of post-construction project management. |
SAPS |
1992-1993 |
|
Indonesia |
Government/IBRD |
Second JABOTABEK Urban Development - Major Drainage Works Component
Construction of drainage system for the central part of Jakarta. |
DD, CS |
1991-1993 |
|
Indonesia |
Government/ADB |
Central Java Groundwater Irrigation Development
Groundwater irrigation development in selected areas (27,500 ha),
preparation of farmer-group pilot investment schemes for groundwater
irrigation, support programs strengthening private drilling contractors
and groundwater abstraction regulation program, training and institutional
development, engineering for production wells and irrigation and drainage
facilities. |
FS, DD |
1988-1993 |
|
Indonesia |
Government/IBRD |
East Java and Sulawesi Groundwater Development I&II
Technical assistance in planning, design and implementation of
groundwater irrigation development in East Java (680 tubewells) and in
Central and South Sulawesi (345 tubewells). |
DD, CS |
1988-1993 |
|
Indonesia |
Government/JBIC |
Sembayat Barrage
Review of previous study and detailed design for river improvement and
flood control on the Solo River basin. |
FS, DD |
1991-1992 |
|
Indonesia |
JICA |
Cidanao and Cibanten River Basins Water Resources Development
Municipal and industrial water supply to Cilegon area.
Project target year: 2000 |
FS |
1990-1992 |
|
Indonesia |
JBIC |
Lower Bengawan Solo Basin Flood Control
Feasibility-level supplemental project study and preparation of an
implementation program. |
SAPROF |
1991 |
|
Indonesia |
Government/JBIC |
Mt. Semeru Urgent Rehabilitation -Volcanic Debris and Mud Flow Control
Sabo dam rehabilitation: 2 dams 12,700 m3
River excavation: 4 river stretches 1,282,000 m3
Levee embankment: 4 river stretches 11.1 km |
DD, CS |
1985-1991 |
|
Indonesia |
Government/JBIC |
West Jakarta Flood Control
Flood damage mitigation (25-year flood) in West Jakarta and its
surrounding area (8,200 ha).
1st phase 752 ha, 2nd phase 2,540 ha, 3rd phase 4,908 ha and Total 8,200
ha |
DD, CS |
1985-1991 |
|
Indonesia |
Government/JBIC |
Lower Jeneberang River Urgent Flood Control
River channel improvement, establishment of flood forecasting and
warning system, and flood drainage improvement in Ujung Pandang city.
River improvement
Design flood discharge: 2,100 m3/s - 2,300 m3/s
River channel improvement: Dredging 60,000 m3, Excavation 730,000 m3, Dike
9,040 m, Revetment 2,370 m
Drainage improvement: Design discharge, 10.5 m3/s - 30.0 m3/s
Drainage channel improvement: Dredging 50,000 m3, Excavation 40,000 m3,
Revetment 27,600 m |
DD
CS |
1983-1984
1987-1991 |
|
Indonesia |
Government/JBIC |
Lower Asahan River Flood Control
Improvement of 43 km long section of the Asahan River against 1,100
m3/s flood discharge and 19 km long section of the Silau River against
1,200 m3/s flood discharge, and detailed design for flood forecasting and
warning system. |
DD |
1988-1990 |
|
Indonesia |
JICA |
Integrated Lower Asahan River Basin Development - I&II
Flood control, agricultural and agro-industrial development to year
2005 (Study area: 6,000 km2). |
MP, FS
MP
|
1984-1985
1989-1990 |
|
Indonesia |
JICA
Government/JBIC |
Overall Ular River Basin Flood Control and Irrigation Systems
Improvement
Irrigation: 18,500 ha, main canals 44.8 km, secondary canals 327.4 km,
main drains 195 km, secondary drains 136.3 km |
FS
DD
CS |
1977-1980
1980-1981
1982-1990 |
|
Indonesia |
JBIC |
Brantas Basin Development Projects Post Construction Appraisal
Post construction appraisal for JBIC financed projects (9 projects) in
Brantas river basin.
Preparation of action program for institutional and managerial improvement
of project operations. |
S |
1986-1988 |
|
Indonesia |
Government/IBRD |
East Java Groundwater Development
1st stage: observation wells 52 nos., production wells 53 nos.,
groundwater irrigation facilities 2,498 ha
2nd stage: observation wells and production wells
32 nos., groundwater irrigation facilities 3,365 ha |
FS, DD, CS |
1982-1988 |
|
Indonesia |
Private Company |
Surabaya City Water Supply
Water supply to Surabaya and other demand centers in Brantas basin to
year 2010. |
MP |
1987 |
|
Indonesia |
Government/IBRD |
Cisadane River Basin Comprehensive Development
Long-term multiple water resources development in Jakarta and its
surrounding area to year 2025.
Study area: 7,500 km2, Irrigation: 62,000 ha, Water supply: 63
m3/sec, River water flushing for refuse disposal: 15 m3/sec, Power: 50 MW |
MP, FS |
1985-1987 |
|
Indonesia |
Government/IBRD |
Hydropower Potential Study
Preparation of a national hydropower development program up to year
2003.
Study area: Whole Indonesia 1,904,000 km2, Identified sites:
1,275 sites (74,976 MW), Selected projects through 2003: 67 schemes 6,310
MW
And continuation study on 5 selected schemes. |
MP
FS |
1981-1983
1983-1987 |
|
Indonesia |
ADB
Government/ADB |
Tulungagung Area Flood Control and Drainage
Flood drainage: Main drainage canal 24.2 km, diversion tunnel 1.1 km,
7.5 m in dia., 530 m3/sec., Land reclamation: Net benefited area for paddy
cultivation: 12,930 ha (swamp area: 3,000 ha) 183.3 km |
FS, DD
CS |
1978-1979
1980-1987 |
|
Indonesia |
JICA |
Widas Flood Control and Drainage
Flood control and drainage improvement including dredging works: River
channel improvement: 81.8 km, Flood diversion channel: 2.9 km, 3
controllable retarding basins: 23.5 MCM, design probable flood: 25 years |
MP |
1984-1986 |
|
Indonesia |
Government/IBRD |
Madiun - Solo Groundwater Development
Groundwater exploitation in Madiun area
Irrigation: 250,000 ha |
FS
DD, CS |
1972
1978-1986 |
|
Indonesia |
JICA |
North Banten Water Resources Development
Master plan: Study area: 3,550 km2
Irrigation: 3 schemes, 63,230 ha
Municipal water supply: 114,400 m3/day
Industrial water supply: 83,000 m3 /day flood control |
MP, FS |
1982-1983 |
|
Indonesia |
Government/IBRD |
Upper Jatiluhur and Coastal Strip Water Resources Development
Irrigation (Upper Jatiluhur area): 61,770 ha, fishpond development
(coastal strip area): 45,000 ha, flood control and river improvement |
FS |
1981-1983 |
|
Indonesia |
Government/IDA |
Jatiluhur Irrigation Extension
Land reclamation, flood control, irrigation and drainage facilities.
Irrigation: Net area 51,000 ha, secondary canals 270 km, tertiary canals
500 km (swamp area reclamation: 4,000 ha) |
DD, CS |
1975-1983 |
|
Indonesia |
JICA |
Central South Sulawesi Overall Water Resources Development
|
MP |
1978-1980 |
|
Indonesia |
Government/JBIC |
Kali Porong River Improvement
River channel improvement: 50 km
Gated weirs: overflow-type height, 11 m Crest length, 150 m and river bed
dredging |
FS, DD, CS
|
1963-1977 |
|
Indonesia |
Government
JICA |
Bengawan Solo River Basin Development
|
MP, DD
S |
1963-1965
1972-1974 |
|
Indonesia |
FAO/UNDP |
Southeastern Sumatera Land and Water Resources Development
|
MP, FS, DD |
1972-1973 |
|
Indonesia |
Government/
JICA |
Kali Brantas River Basin Development
|
MP
FS |
1959-1961
1971-1972 |
|
Indonesia |
JICA |
Barito River Basin Development
|
MP |
1970-1971 |
|
Indonesia |
Government/JBIC |
Lampung and South Sumatera Provinces Land and Water Resources
Development
|
MP |
1964-1967 |
|
Indonesia |
Government/JBIC |
Lodoyo Sand Conveyer System
|
S, D |
1962-1965 |
|
Indonesia |
JICA |
Larona River Basin Hydropower
|
S |
1964 |
|
Malaysia |
JBIC
Government/JBIC |
Pahang-Selangor Raw Water Transfer
Transfer water scheme for Pahang State to Selangor State to overcome
the shortage of water resources to the States of Selangor, Kuala Lumpur,
and Negeri Sembilan.
Transfer Tunnel: L=43,700 m, Diameter=4.8 m |
SAPROF
DD |
1999
1999-2000 |
|
Malaysia |
JICA |
Peninsular Malaysia Small Reservoir Development
Small reservoir development
Study area: 400,000 ha |
FS |
1993-1995 |
|
Malaysia |
JICA |
Penang Island Flood Damage Mitigation and Drainage Improvement
Flood damage mitigation and drainage improvement in Penang Island up to
year 2000 (Study area: 285 km2). |
MP, FS |
1989-1991 |
|
Malaysia |
JICA |
Kelantan River Basin Flood Mitigation
Comprehensive flood control in Kelantan river basin up to year 2010.
Design flood: 50-year flood, 10,650 m3/s
Study area: 13,000 km3 |
MP, FS |
1988-1989 |
|
Malaysia |
JICA |
Kelang River Basin Flood Damage Mitigation
Basin-wide flood damage mitigation (1,425 km2) covering
Kuala Lumpur metropolitan area and adjacent cities to year 2005, and
feasibility study for identified urgent schemes. |
MP, FS |
1987-1989 |
|
Malaysia |
Private Company |
Sg. Selangor Water Supply
1st phase water supply: 6,000,000 m3/day
2nd phase water supply: 6,000,000 m3/day |
S |
1985 |
|
Malaysia |
JICA |
South Johor Water Resources Development
Development of municipal water supply, irrigation, flood control, and
environmental conservation.
Study area: 19,140 km2 |
MP |
1984-1985 |
|
Malaysia |
JICA |
Perlis, Kedah and Plau Pinang States Water Resources Development
Ccomprehensive water resources development to year 1995-2000. The study
aimed to prepare an integrated water resources development and management
plan to meet a projected total water demand, 709 million m3 for domestic
and industrial water and 2.2 billion m3 for irrigation.
Study area: 11,330 km2 |
MP, FS |
1982-1985 |
|
Malaysia |
Government/JBIC |
Reman Reservoir
Reservoir schemes for trans-basin irrigation, municipal and industrial
water supply in Perlis, Kedah, and P.Pinang States.
Main Dam: Rockfill, H=40 m, Crest length=170 m, V=28,600 m3
Water supply: 364,000,000 m3/year |
FS |
1983-1984 |
|
Malaysia |
JICA |
National Water Resources Study
Preparation of nationwide water resources development plan and
national-level master action plan (legal and institutional) to year
1995-2000.
Study area: Entire Malaysia 330,000 km2 |
MP |
1979-1982 |
|
Philippines |
Government/JBIC |
Kamanava Area Flood Control and Drainage System Improvement Project
Works Proposed in Northern Area of Malabon River
- Construction of Polder Dike
- Raising of River Wall
- Construction of navigation Lock
- Construction of Independent Flood Gates
- Construction of Control Gates
- Construction of Pumping Station with ancillary Flood Gates
- Construction of Pumping Station without Flood Gates
Works proposed in Southern Area of Malabon River
- Raising of River Wall
- Construction of Independent Flood-Gate
- Construction of Pumping Station with ancillary Flood Gates
- Improvement of Existing Drainage Channels
- Construction of New Drainage Channels |
DD, CS |
2000-2006 |
|
Philippines |
JICA
Government/JBIC |
Pinatubo Hazard Urgent Mitigation (I), (II)
Control and mudflow in the Abacan and Sacobia-Bamban River Basins and
to carry out the feasibility study for the priority schemes, detailed
design and supervision for the construction works.
(Phase I)
- Sacobia/Bamban River Improvement (D/D, C/S)
- Improvement of Bamban river: 32.3 km
- Reinforcement of sand pocket structures in Bamban river
- Channel excavation of Sacobia river: 5 km
- Improvement of Saban, Kauyan rivers: 2.65 km
- Rehabilitation of two bridges and National Route No.2
- Agriculture Development in Sand Pocket Area (F/S)
- Improvement of Pasig, Poretoro Rivers (F/S)
(Phase II)
1) Detailed Engineering Design of the following sub-project
- Dredging in the Delta Area
- Raising of Southwest Megadike
- Closure Dike (Phase I)
- Sapang Labuan River/Baluyot Channel Realignment
- Pilot Channel Dredging and Third River
- Realignment of San Francisco to Sasmuan Channel
2) Pre-construction and construction-supervision of the following
sub-projects
- Repair of Damaged Southwest Corner of Megadike
- Raise Southwest Megadike
- Closure Dike
- Reinforce Baluyot Channel West Bank
- Raise the Sta. Barbara Bridge Approach
- Baluyot Channel Excavation
- Sapang Labuan River/Baluyot Channel Realignment
- San Fenando-Sto. Tomas Minalin Tail Dike
- Bacolor Tail Dike/Evacuation Road
- Dredging of Delta Area
- Pilot channel Dredging and Third River
- Downstream Channel Passing Sasmuan
3) Monitoring and Planning of Flood Control Works in the Pasac Delta
(including the Porac-Gurnain River Basin) and Third River Channel |
MP, FS
DD, CS (I)
DD, CS(II) |
1993-1996
1997-2000
2000-2003 |
|
Philippines |
Government/JBIC |
Lower Agusan Basin Development-Flood Control Component
(Stage I, Phase I)
Construction of flood control facilities and land improvement works in
West (Left) Bank of Butuan.
(Stage I, Phase II)
Construction of flood control facilities and land improvement works in
East (Right) Bank of Butuan City, and construction of Magsaysay viaduct.
Dike: 12.4 km
Drainage system: 33.3 km
Dredging: 1,100,000 m
Land Improvement: 248 ha |
DD
CS (I)
CS (II) |
1982-1983
1989-1999
1998-2003 |
|
Philippines |
JICA |
The Flood Control Project for the Lower Cagayan River
Feasibility study of the Lower Cagayan River Flood Control to improve
the socio-economic status of the area through mitigation of flood and
reduction of flood damages |
FS |
2000-2002 |
|
Philippines |
JICA |
The Study on Water Resources Development for Metro Manila
Formulation of a Master Plan on water resources development in the Agos
River Basin (including Kanan and Kaliwa River Basins) to supply
domestic/municipal and industrial water to Metro Manila, and feasibility
study on the priority project(s) selected from the master plan. |
MP, FS |
2001 |
|
Philippines |
JICA
Government/JBIC |
Pampanga Delta Development
Irrigation Component (11,540 ha)
Diversion weir: Combined fixed and movable type, 18.92 MCM
Main, lateral and secondary canals: 162 km
Flood Control Component: River channel improvement: Sulipan to Manila Bay
22.7 km
Construction of Labangan Floodway: Calumpit to Manila Bay; 16.9 km
Construction of new channel: Pampanga river=Labangan floodway; 4.8 km |
FS
DD
SAPI
CS (Fl.)
CS (Irr.) |
1980-1981
1987-1989
1995-1996
1991-2000
1992-2001 |
|
Philippines |
JICA |
Study on Comprehensive Disaster Prevention around Mayon Volcano
Formulation of master plan on the disaster prevention for the Mayon
Volcano Area and execution of feasibility study on the urgent and/or
priority projects which was selected from the master plan. |
MP, FS |
1998-2000 |
|
Philippines |
Government/JBIC |
Flood Forecasting & Warning System for Dam Operation-I & II
Establishment of telemeterized FFWS for dam operation to provide
additional information for the safe and effective operation and management
of major dams in Luzon and to forewarn the inhabitants in the flood plains
downstream of these damsites of impending releases through the spillways.
Construction of PAGASA Data Information Center |
DD, CS
SAPS |
1983-1994
1998-1999 |
|
Philippines |
JICA |
Master Plan Study on Water Resources Management
Formulation of master plan on water resources development and
management in the twelve water resources regions of the Philippines. |
MP |
1997-1998 |
|
Philippines |
JBIC |
Groundwater Irrigation
Survey on existing irrigation facilities in Tarlac Province and
establishment of TOR on implementation plan. |
SAPS |
1996-1997 |
|
Philippines |
Private Company/WB |
National Urban Sewerage and Sanitation Strategy Plan and Feasibility
Studies
Preparation of national strategy and action plan for the
sewerage/sanitation in urban areas. |
MP, FS |
1992-1993 |
|
Philippines |
Government/IBRD |
Luzon Island Small Hydroelectric (10 sites)
Preparation of general tender documents for small hydropower schemes in
Luzon Island (10 sites, 565 MW in total). |
FS |
1991-1992 |
|
Philippines |
Government/JBIC |
North Laguna Lakeshore Urgent Flood Control and Drainage
Habitual flood damage mitigation in East and West Mangahan areas along
North Laguna Lakeshore.
Project area: 37 km2 |
DD |
1991-1992 |
|
Philippines |
JICA |
Metro Manila Flood Control and Drainage Improvement
Medium-term (year 2000) and long-term (year 2020) flood control and
drainage improvement in Metro Manila (Study area: 636 km2), and
study for urgent schemes selected. |
MP, FS |
1987-1990 |
|
Philippines |
JICA |
Luzon Island Hydropower Potential Study
Hydropower project inventory (144 schemes, 5,130 MW, 22,503 GWh/year),
elimination screening and preparation of promising hydropower project
catalogue and master action program for orderly development to year 2005
and establishment of computer programs and data bank system. (Study area:
5 regions, 10,500 km2). |
MP |
1985-1987 |
|
Philippines |
JICA |
Cagayan River Basin Water Resources Development
Comprehensive basin development to year 2005.
Catchment area: 27,300 km2
5 flood control dams and river improvement, irrigation(77,542 ha in
total), power (934 MW in total), and water supply (923,000 m3/day) |
MP |
1985-1987 |
|
Philippines |
JICA |
Panay River Basinwide Flood Control
Flood control and river improvement (150 km), flood plain management
system (340 km2), flood forecasting and warning system,
irrigation (2 schemes 5,400 ha), water supply (Roxas City 7,450 m3/day),
and power (7,100 kW). |
MP, FS |
1983-1985 |
|
Philippines |
JICA |
Mayon Volcano Sabo and Flood Control
Sabo dams: 3 river basins, 11 sites
River improvement: 3 river channels, 76 km
Flood damage mitigation: 113 km2
Irrigation: 8,750 ha |
MP |
1979-1983 |
|
Philippines |
Government/JBIC |
Nationwide Flood Control
Master plan for flood control and river improvement of all major and
secondary river basins in the Philippines.
Project target year: 2000 |
MP |
1980-1982 |
|
Philippines |
Government/JBIC |
Nationwide River Dredging II
Planning and recommendation of long term river improvement and dredging
program for flood control on 12 major rivers, and technical advice for
dredging works. |
MP |
1980-1982 |
|
Philippines |
JICA |
Pasig Potrero River Flood Control
|
FS |
1977-1978 |
|
Philippines |
JICA
Government/JBIC |
Urgent Rehabilitation and Improvement Works for Agno River Flood
Control (Phase I & II)
Formulation of overall and systematic control plan on the Agno river
and its adjoining river basins covering an area of 7,500 km2
and identification of priority projects for flood control plan.
Phase I: Lower Agno River and Upper Sinocalan River
Phase II: Upper Agno River
Agno River (24.5 km); Bayambang stretch with Poponto retarding basin to
the upstream end
- Improvement of Bayambang stretch 3.4 km
- Improvement of Poponto floodway 9.1 km
- Improvement of upper Agno stretch 12 km
Pantal-Sinoalan River (52 km); Downstream stretch to protect Dagupan town
area
- Improvement of Pantal-Sinocalan 18 km
- Improvement of Dagupan (back levee) 22 km
- Improvement of Ingalera |
MP, FS
DD
CS (I&II) |
1988-1991
1992-1994
1996-2006 |
|
Bangladesh |
JICA |
North West Region Flood Protection and Drainage Improvement
|