Full Water List
Home Services Countries Latest News Search Site Recruitment NK Tokyo

More information is available from
Nippon Koei UK

61/63 Crockhamwell Road, Woodley,
Reading RG5 3JP United Kingdom
Tel: +44 (0)118 927 7550
Fax: +44 (0)118 969 1534
email: info@nkuk.co.uk

Below is a complete list of Water & Wastewater projects on which Nippon Koei has worked in recent years. To return to the Water & Wastewater Sector page click here

List of Experience in Water & Sanitation Development

Country

Client/Finance

Project

Services

Period

Cambodia

JICA

Drainage Improvement and Flood Control in the Municipality of Phnom Penh

Improvement of existing urban drainage and flood control system in Phnom Penh area.
Component A: Reinforcement of dikes
Kop Srov dike (7.65 km), Tompun dike (4.44 km), Svay Pak drainage sluiceway (1.5 x 2.0 m)
Component B: Tumpun watershed drainage improvement
Pumping Station (15 m3/s), Meanchey drainage stretch (2.64 km), Tum Mup Toek drainage sluiceway (10 m3/s), Salang drainage stretch (0.9 km)

MP, FS
BD

1997-1999
2001

Cambodia

JICA

Siem Reap Water Supply Project

Comprehensive master plan and feasibility study for water supply for City of Siem Reap including review of water quality of Ton Le Sap Lake, West Barai Lake, Ton Le Sap River, and underground water, and out lining of water supply routes and preliminary design for water supply pipelines based on the water resource management scheme and demand forecast of treated water.

MP, FS

1996-2000

Lao PDR

JICA

Watershed Management Plan for Forest Conservation in Vangvieng District

Formulation of integrated watershed management plan in Vangvieng district in order to contribute to the improvement of resources management and livelihood of the local people.

MP

1996-1998

Lao PDR

JICA

Vientiane Area Drainage System Improvement

Improvement of the flood control and drainage system, putting main focus on inland water drainage in the area surrounded by the Mekong and Hong Xeng rivers, Wattay Airport and That Luang Marsh (52 km2).

MP, FS

1989-1990

Lao PDR

UN/UNDP

Nam Ngum River Basin Development

MP, FS

1959-1964

Lao PDR

Japanese Government

Lower Mekong-Major Tributaries (34 rivers) Reconnaissance Survey

S

1959-1961

Lao PDR

UN

Comprehensive Lower Mekong Development Reconnaissance Survey

S

1956

Myanmar

JICA

Solid Waste Disposal in Yangon City

Assist in formulating solid waste disposal planning in Yangon city.

S

2000-2001

Myanmar

Government

Thanintharyi (Tenasserim) River Basin Hydropower Development

Preliminary hydropower potential study for electric power supply development in the target area.

S

1996-1997

Thailand

JBIC

The Environmental Fund Project

This Fund was established to efficiently meet the financial requirements of the environmental projects across Thailand. Under the assistance of ODA loans, 24 solid waste disposal projects and 4 waste water treatment projects have been formulated and approved as sub-projects.
This study will draw up a project formulation manual for local municipalities, which are responsible for sub-project formulation, and screening guidelines for the Ministry of Science, Technology and Environment, which is responsible for screening projects. The study will also make proposals on how to address environmental and social considerations, and invite personnel for training, in an effort to ensure that the sub projects are executed accurately.

SAPI

2001-2002

Thailand

JETRO

Tha Sae-Bang Saphan Water Conveyance Project

The water conveyance pipeline from Tha Sae Dam (under planning) Saphan Industrial Estate (Total pipeline length: about 70 km).

FS

2000-2001

Thailand

JBIC

Tha Sae Reservoir Project

Review and up-grading of the existing project plan in order to prepare for the project implementation by JBIC loan. The scope of the project is construction of reservoir (Zoned Earth Fill, H=59 m) in Chumporn Province to improve water supply to meet the water demand for irrigation and for industry and to control floods.

SAPROF

2000

Thailand

JICA

Sewage Sludge Treatment/Disposal and Reclaimed Wastewater Reuse

Master plan study on sewage sludge treatment and reuse of reclaimed wastewater in Bangkok Metropolitan area.

MP

1998-1999

Thailand

JICA

Kok Ing Nan Water Diversion

Study for construction of water diversion canal and tunnel for 2.5 billion cubic meter volume of water.
The maximum discharge capacity of canal structures would be 175m3/s (River Training: 50 km, Total Canal Length: 40 km, Total Tunnel Length: 60 km, Total Irrigation Area: 300,000 ha).

MP, FS

1996-1999

Thailand

JBIC

BMA Waste Water Management Project

Survey and investigation for construction of sewerage treatment systems in Thonburi (51.22 km2) and Khlong Toey (57.15 km2) districts in Bangkok Metropolitan area.

SAPROF

1997-1998

Thailand

JICA

Phukhet Municipality Sewerage and Drainage Improvement

Comprehensive program for improvement and development of sewerage and storm water drainage system in Phukhet municipal area, and urgent priority schemes.

MP

1989-1990

Thailand

Government

Kong Chi Mun Area Water Resources Development

Multi-regional water resources development in Nong Khai area (13 provinces, 350,000 ha).

S

1989-1990

Thailand

JICA

Chao Phraya River Basin Flood Forecasting and Warning System Development

Basin-wide flood forecasting system
Catchment area: 162,000 km2

FS

1987-1988

Thailand

JICA

Sakae Krang River Basin Development

Basin-wide agricultural development
Irrigation: 46,700 ha, V=2,500,000 m3
Dam: Rockfill
Main canals: 76.7 km

FS

1984-1986

Thailand

Government/JBIC

Nong Pla Lai Multipurpose Dam

Dam: Earth-fill, 31 m high, 4,060 m long, 4,000,000 m3 volume
Irrigation: 21,200 ha, Municipal and industrial water supply: 36.2 million m3/day

DD

1984-1985

Thailand

JICA

Nong Kho-Laem Chabang Water Pipeline

Municipal and industrial water supply
1st stage: Pipeline 14.4 km, design water discharge 0.82 m3/s
2nd stage: Pipeline 14.4 km, design water discharge 0.82 m3/s

FS

1983-1984

Thailand

JICA

East Coast Multi-Basin Integrated Water Resources Development-Phase II

Long-term and multi-regional water resources development to year 2001.
Irrigation: 16,700 ha in total
3 dams: earthfill, H=20~21 m

MP, FS

1982-1983

Thailand

Government/Japanese Government

Southern Thailand Hydroelectric Development Project

FS

1967-1978

Thailand

Japanese Government, Mekong Committee

Lower Mekong River Tributaries Development

S

1958-1961

Thailand

UN

Lower Mekong River Basin Development

S

1956-1958

Vietnam

Government/JBIC

Nhon Trach Water Supply in Dong Nai Province

Water Supply to industrial zone and residence along National Road No. 51 such as: Tam Phuoc, An Phuoc, Long Thanh and Nhon Trach in Dong Nai Province with capacity of 100,000 m3/day.

DD, CS

2000-2004

Vietnam

Government/JBIC

Da Den Dam Water Supply System in Ba Ria-Vung Tau Province

Clean water supply for domestic and industrial use and other business and services activities in the urban areas and industrial zones in Ba Ria - Vung Tau province with a capacity of 50,000 m3/day.

DD, CS

2000-2004

Vietnam

IBRD

Water Resources Assistance Project

Preparation of three component of the Vietnam Water Resources Assistance Project(1) Integrated Development of the Thu Bon Basin(2) Irrigation Modernization(3) Dam Safety Management

MP, FS

2002-2003

Vietnam

JICA

Nationwide Water Resources Development and Management

Formulation of master plan for nationwide water resources development and management including integrated river basin management plan for the selected 14 major river basins and conducting feasibility study on priority Projects.

MP, FS

2001-2003

Vietnam

JBIC
Government/JBIC

Drainage Project for Environmental Improvement in Hanoi City

Dredging works for 4 major rivers and 4 major lakes, construction of regulating reservoir (4,000,000m3), 4 water pumping stations (135m3/s), 2 waste water treatment plants, rehabilitation works of existing sewerlines, etc. for the mitigation of floods and inundation in Hanoi City.

SAPI
DD, CS

2000
1997-2003

Vietnam

JETRO

Salt Intrusion Prevention Project in North Ben Tre and Tra Vinh of Mekong Delta

Feasibility study on Salt Prevention Plan in the downstream area of Mekong Delta. The purpose of the project is to obtain the geological conditions of the locations where new hydraulic structures are expected to construct.

FS

2001-2002

Vietnam

JICA

Hydro-Meteorological Monitoring for Water Quality Rules in Mekong River Basin

Study flow regime of the Mekong River system and assist Mekong River Commission (MRC) in the processes of the preparation of the draft MRC's Rules for water quantity/utilization, and strengthen the institutional framework and capacity of the reparian members and MRCS.

MP

2001-2002

Vietnam

JICA

Project for Urgent Equipment Supply for Waste Management in Hanoi City

To prepare a basin plan for the procurement of necessary equipment, machinery and vehicles for solid waste management in Hanoi City. The examination of the whole solid waste management process, from collection to disposal/treatment, is undertaken to this end Environmental/Social issues are also included in this plan.

BD

2001-2002

Vietnam

JICA

Groundwater Development in the Rural Provinces of the Central Highlands

Evaluation of groundwater resources potential in the Study area, formulation of groundwater development plan and a long-term water supply plan for target communes in the three (3) provinces of Kon Tum, Gia Lai and Dac Lac, feasibility study for selected priority projects.

MP, FS

2000-2002

Vietnam

JICA

Sanitation Improvement Plan for Haiphong City

Formulation of sanitation improvement plan on water supply, sewerage (including drainage) and solid waste management system and conducting feasibility study on drainage and sewerage system and/or solid waste management system for the priority, project identified in the master plan study.

MP, FS

2000-2001

Vietnam

JBIC

Water Supply Project Along the Route 51 in Southern Vietnam

Review and up-grading of the existing pre-feasibility study in order to prepare for the project implementation by JBIC loan. The Project features the construction of water supply pipes from Dong Nai River to Ho Chi Minh City and surrounding industrial estates, and the dam construction in Varia-Vung Tau area for water supply for Varia-Vung Tau region. The total capacity of water supply amounts to 1,700,000 m3/day by the year 2015.

SAPROF

1997

Vietnam

Private Company

Industrial Waste Management in Hanoi City

Managing the industrial waste in Hanoi city to cover the future industrialization.
Project area: Minh Tri in the district of Soc Son, which is situated 40 km north of the center of Hanoi City.

S

1997

Vietnam

JICA

Dong Nai River and Surrounding Basin Water Resources Development

Water resource development of Dong Nai River for 4 principle tributaries (Be river, Saigon river, La Nga river and Vam Co river) and adjacent coastal river catchments.
(Study Area: 46,000 km2)

MP, FS

1994-1996

Vietnam

Government/
Private Company
JICA

Urban Drainage and Wastewater Disposal Systems in Hanoi City

City-wide drainage and wastewater disposal systems covering an area of 140 km2 including the urbanized area (50 km2) and its adjoinings (90 km2) in Ha Noi City.

S
MP, FS

1991
1993-1995

Vietnam

Government

Song Cai River Basin Development

MP

1973-1975

Vietnam

Government/ADB

Binh Dinh Province Water Resources Development

MP

1966-1967

Vietnam

Japanese Government

La Nga River Basin Development

MP

1964-1966

Vietnam

JICA

Upper Srepok River Basin Development

MP

1961-1966

Vietnam

UN

Upper Se San River Basin Development

MP, FS

1961-1964

Vietnam

Government

Upper Dong Nai River Basin Development

S

1962-1963

Indonesia

Government/JBIC

Ciliwung Cisadane River Flood Control Project

Mitigation of flood damages in the area along the lower reaches of the Cisadane river by means of the construction of the Ciliwung floodway and the river improvements of lower reaches of the Cisadane river.
Ciliwung Floodway Tunnel
Length of tunnel: 913 m, Inner diameter of tunnel: 8.0 m, Discharge capacity: 300 m3/s per 1 channel
Cisadane River Channel
Improvement length: 15 km, Design discharge: 1,500 m3/s for 25 year probable flood

DD, CS

1999-2005

Indonesia

JICA

Study on Flood Control and Water Management in Limboto-Bolango-Bone Basin

The objectives of the study are:
1) to formulate a master plan of sustainable flood control and water management plan in Limboto-Bolango-Bone basin,
2) to conduct the feasibility study on the priority projects, and
3) to transfer technology to counterpart personnel in the cause of the study

MP, FS

2001-2002

Indonesia

Government/JBIC

Lower Solo River Improvement

Mitigation of flood damages on the flood prone area, and contribution to the stability of agricultural production and to accelerate socio-economic activities in Bojonegoro and Babat area.
River Improvement Works
- Dikes: 492 km
- Revetment: 23,000 m.
- Sluiceway with gates: 250 nos.
- Bridges: 11 new and 7 raising
- Associated roads: 28 km
- Short-cut channel: 1.5 km
North Diversion Floodway (D/D)
Jabun Retarding Basin (D/D)

DD
FS
CS

1992-1994
1994
1996-2002

Indonesia

Indonesia

Special Assistance for Project Sustainability for Twenty Four Infrastructure Rehabilitation Projects (Package A)

Review study of completed infrastructure projects in river improvement and water resources development sector under the Japanese ODA loan, formulation of rehabilitation plan, and recommendation on improvement of maintenance system.

SAPS

2001

Indonesia

JICA

Urgent Countermeasures for Sedimentation in Wonogiri Multipurpose Dam Reservoir

The prime objective of this Project is to decrease sediment influx into the Wonogiri dam reservoir to retain the reservoir capacity as much as possible for flood control, and stable water supply for irrigation, domestic and industrial use and hydropower generation. To this end, the following 3 components will be examined in this study:
1) Construction of two check dams on the Kali Kuduang just before the river enters into the reservoir.
2) Sediment dredging in front of the intake. (100,000m3)
3) Supply of a unit of sediment removal system comprising dredger, working boat, discharge pipes and accessories.

BD

2001

Indonesia

JICA

Study on Rural Water Supply in Nusa Tenggara Barat and Nusa Tenggara Timur

The study aims to formulate a strategy and implementation plan for rural water supply (groundwater and springs in the area), and to review and give recommendations on operation & maintenance services for sustainable water supply management.

MP, FS, BD

2001

Indonesia

JBIC

Infrastructure Rehabilitation Projects (Package C)

The purpose of the project is to examine seven projects in the water resource and irrigation sector and two projects in the port sector. These were all found to be in need of rehabilitation in the previous study packages A and B of completed infrastructure projects financed by ODA loans.
The present study will provide support for adopting specific measures and putting in place supervisory arrangements in implementing rehabilitation work aimed at strengthening project operation, maintenance and control.

SAPS

2001

Indonesia

JBIC

24 Infrastructure Rehabilitation Projects (Package A)

Some of the infrastructure projects supported by the ODA loans have been in operation for long periods of time after completion and are in need of restoration and rehabilitation due to natural disasters and other reasons. The purpose of the project is to restore and rehabilitate the existing infrastructure, which is regarded as a priority by the government of Indonesia.
The study will conduct technical and other examinations required for rehabilitation work, with regard to the projects supported by ODA loans and whose need for rehabilitation has been approved.

SAPS

2001

Indonesia

Government/JBIC

Study on Policy Reform in Water Resources Sector (WATSAL)

Objectives are to improve national institutional framework for water resources development and management, organizational and financial framework for river basin management, regional water quality management regulatory institutions and implementation, and national irrigation management policy, institutions and regulations.

S

2000-2001

Indonesia

Government/JBIC

Sector Program Loan for Water Resources Development Project

Monitoring services for project implementation and technical services for design review.
The major objectives of the project are to achieve:
a) tangible and quick effects on employment generation,
b) food security, and
c) protection of socially vulnerable groups caused by economic crisis.

S, DD, CS

1999-2001

Indonesia

Government/JBIC

Major and Minor Drainage Improvement Works in Surabaya Urban Development Project

Drainage improvement for Gurungsari canal and Diversion channel in Southern and Western part of Surabaya.

CS

1994-2000

Indonesia

Government/JBIC

Project Type Sector Loan for Water Resources Development

Evaluation, monitoring, technical assistance and formulation of possible subsequent project for rehabilitation/completion/upgrading of medium and small irrigation of 38 schemes, 100,285 ha of village irrigation schemes, 7 schemes of swamp development, 32 schemes of pond water resources conservation and 8 schemes of flood control and river works.

S, DD, CS

1997-1999

Indonesia

Government/IBRD

Hydro Inventory and Pre-feasibility Studies

Updated hydroelectric and pumped storage inventories, formulated a long term strategy for hydro-resource development and identification of priority schemes.

S

1996-1999

Indonesia

JICA

The Study on Comprehensive Management Plan for the Water Resources of the Brantas River

Formulation of a comprehensive water resources management plan for the Brantas River basin including a structural development plan for appropriate water use management.
Catchment area: 11,800 km2
River length: 320 km

MP

1996-1998

Indonesia

JICA

Greater Jakarta Urban Drainage and Waste Water Disposal

Improvement of urban drainage and development of integrated sewerage system in Jakarta metropolitan area.
Study area: 650 km2
Channel Improvement and Construction: 87.5 km
Pump Station Construction: 2 pump stations
Sewerage Development Area: 16,604 ha, 140 villages
Treatment Plant: 6 places, 160 ha (in total) Served Population 6,449,000

MP, FS
DD

1989-1991
1996-1998

Indonesia

JICA

Revision of Jakarta Water Supply Development Master Plan

Review of existing plan and progress of the project for establishing plan up to year 2019 on water supply project in development Jakarta Metropolitan Area.

MP, FS

1995-1997

Indonesia

JICA

Comprehensive Water Management Plan in JABOTABEK

Preparation of water management plan including flood control for JABOTABEK area (Jakarta Metropolitan Area, Bogor, Tanggerang, and Bekasi provinces).

MP, FS

1995-1997

Indonesia

JICA

Kampur Indragiri River Basin Integrated Development

Overall development plan of Kampur-Indragiri river basin to year 2019.

MP, FS

1993-1996

Indonesia

Government/JBIC

Jakarta Water Supply

Technical assistance in institutional development and project management for executing detailed design and construction supervision of water distribution network rehabilitation and in fill extension works.

DD, CS

1992-1996

Indonesia

Government/JBIC

East Jakarta Flood Control

Construction of Eastern Banjir canal (upper and middle reaches), improvement of Buaran river, Terusan Sunter, Marunda drain and Sunter and Cipinang rivers.
Stage 1
- Eastern Banjir Canal: upper stretch: 5.4 km, design flood: 100-year
- Salinity control barrage: 1 nos.
- Buaran River improvement: lower reaches: 5.6 km, design flood: 25-year
Stage 2
- Eastern Banjir Canal: middle stretch: 8.0 km, design flood:100-year
- Marunda Drain: 5.5 km, Design flood: 25-year
- Improvement of Suntar and Cipinang Rivers: 7 km, Design flood: 25-year
- Tersan Suntar Drain: 7.6 km, Design flood: 25-year

DD, CS

1988-1996

Indonesia

JICA

Ciujung - Cidurian Integrated Water Resources Development

Development of water conveyance system to supply domestic and industrial water to the Jabotabek area from the Ciujung - Cidurian.

FS

1993-1995

Indonesia

Government/JBIC

Ular River Basin Flood Control and Improvement of Irrigation Project

Project area: 45,000 ha, Irrigation area: 18,500 ha
Main canal: 46.68 km, Secondary canal: 155 km

DD, CS

1991-1995

Indonesia

JICA
Government/JBIC

Upper Solo River Improvement and Madiun River Urgent Flood Control

Improvement of 22 km long section of the Madiun River, improvement of river sections at the confluence of 4 tributaries, and construction of 3.8 km long short cut channel.
Excavation: 3,793,000 m3, Embankment: 1,882,000 m3, Revetment: 5.9 km, Drainage Ditch: 59.5 km and
Bridge: 5 nos.

FS
DD, CS

1980
1987-1995

Indonesia

Government/JBIC

Porong River Rehabilitation

Improvement and rehabilitation of damaged river structures along Porong river channel including protection of Porong bridge and improvement of inspection road.
River channel length: 51 km

DD, CS

1989-1994

Indonesia

Government/JBIC

Upper Solo River Improvement

Improvement of Upper Solo river channel (6.2 km) and two tributaries (8.5 km), construction of 2 short-cut channels (4 km).
Excavation: 2,511,000 m3, Embankment: 898,000 m3, Revetment: 3.7 km, Drainage ditch: 19 km and
Establishment of flood forecasting and warning system

CS

1987-1994

Indonesia

JICA
Government/JBIC

Brantas Middle Reaches River Improvement

Total length: 99 km
1st stage:
Design flood discharge: 1,350 m3/s, river bed dredging: 7,088,000 m3/s, levee embankment: 516,000 m3/s
2nd stage:
Design flood discharge: 1,500 m3/s, river bed dredging: 7,525,000 m3/s, levee embankment: 857,000 m3/s, telemeterized flood forecasting and warning system
Catchment area: 11,800 km2, River length: 320 km

FS
DD
CS

1972-1973
1980
1983-1994

Indonesia

JICA
Grant
Government/JBIC

Surabaya River Improvement-Stage I and II

River channel improvement, 5 km stretch for 20-year flood and 19 km stretch for 5-year flood and rehabilitation of existing 2 dams including river dredging works.

MP, FS
DD, CS
FS
DD, CS

1971-1973
1975-1981
1979
1988-1994

Indonesia

JBIC

Brantas River Basin Water Resources Development Project

Evaluation of pertinency of post-construction project management.

SAPS

1992-1993

Indonesia

Government/IBRD

Second JABOTABEK Urban Development - Major Drainage Works Component

Construction of drainage system for the central part of Jakarta.

DD, CS

1991-1993

Indonesia

Government/ADB

Central Java Groundwater Irrigation Development

Groundwater irrigation development in selected areas (27,500 ha), preparation of farmer-group pilot investment schemes for groundwater irrigation, support programs strengthening private drilling contractors and groundwater abstraction regulation program, training and institutional development, engineering for production wells and irrigation and drainage facilities.

FS, DD

1988-1993

Indonesia

Government/IBRD

East Java and Sulawesi Groundwater Development I&II

Technical assistance in planning, design and implementation of groundwater irrigation development in East Java (680 tubewells) and in Central and South Sulawesi (345 tubewells).

DD, CS

1988-1993

Indonesia

Government/JBIC

Sembayat Barrage

Review of previous study and detailed design for river improvement and flood control on the Solo River basin.

FS, DD

1991-1992

Indonesia

JICA

Cidanao and Cibanten River Basins Water Resources Development

Municipal and industrial water supply to Cilegon area.
Project target year: 2000

FS

1990-1992

Indonesia

JBIC

Lower Bengawan Solo Basin Flood Control

Feasibility-level supplemental project study and preparation of an implementation program.

SAPROF

1991

Indonesia

Government/JBIC

Mt. Semeru Urgent Rehabilitation -Volcanic Debris and Mud Flow Control

Sabo dam rehabilitation: 2 dams 12,700 m3
River excavation: 4 river stretches 1,282,000 m3
Levee embankment: 4 river stretches 11.1 km

DD, CS

1985-1991

Indonesia

Government/JBIC

West Jakarta Flood Control

Flood damage mitigation (25-year flood) in West Jakarta and its surrounding area (8,200 ha).
1st phase 752 ha, 2nd phase 2,540 ha, 3rd phase 4,908 ha and Total 8,200 ha

DD, CS

1985-1991

Indonesia

Government/JBIC

Lower Jeneberang River Urgent Flood Control

River channel improvement, establishment of flood forecasting and warning system, and flood drainage improvement in Ujung Pandang city.
River improvement
Design flood discharge: 2,100 m3/s - 2,300 m3/s
River channel improvement: Dredging 60,000 m3, Excavation 730,000 m3, Dike 9,040 m, Revetment 2,370 m
Drainage improvement: Design discharge, 10.5 m3/s - 30.0 m3/s
Drainage channel improvement: Dredging 50,000 m3, Excavation 40,000 m3, Revetment 27,600 m

DD
CS

1983-1984
1987-1991

Indonesia

Government/JBIC

Lower Asahan River Flood Control

Improvement of 43 km long section of the Asahan River against 1,100 m3/s flood discharge and 19 km long section of the Silau River against 1,200 m3/s flood discharge, and detailed design for flood forecasting and warning system.

DD

1988-1990

Indonesia

JICA

Integrated Lower Asahan River Basin Development - I&II

Flood control, agricultural and agro-industrial development to year 2005 (Study area: 6,000 km2).

MP, FS
MP

1984-1985
1989-1990

Indonesia

JICA
Government/JBIC

Overall Ular River Basin Flood Control and Irrigation Systems Improvement

Irrigation: 18,500 ha, main canals 44.8 km, secondary canals 327.4 km, main drains 195 km, secondary drains 136.3 km

FS
DD
CS

1977-1980
1980-1981
1982-1990

Indonesia

JBIC

Brantas Basin Development Projects Post Construction Appraisal

Post construction appraisal for JBIC financed projects (9 projects) in Brantas river basin.
Preparation of action program for institutional and managerial improvement of project operations.

S

1986-1988

Indonesia

Government/IBRD

East Java Groundwater Development

1st stage: observation wells 52 nos., production wells 53 nos., groundwater irrigation facilities 2,498 ha
2nd stage: observation wells and production wells
32 nos., groundwater irrigation facilities 3,365 ha

FS, DD, CS

1982-1988

Indonesia

Private Company

Surabaya City Water Supply

Water supply to Surabaya and other demand centers in Brantas basin to year 2010.

MP

1987

Indonesia

Government/IBRD

Cisadane River Basin Comprehensive Development

Long-term multiple water resources development in Jakarta and its surrounding area to year 2025.
Study area: 7,500 km2, Irrigation: 62,000 ha, Water supply: 63 m3/sec, River water flushing for refuse disposal: 15 m3/sec, Power: 50 MW

MP, FS

1985-1987

Indonesia

Government/IBRD

Hydropower Potential Study

Preparation of a national hydropower development program up to year 2003.
Study area: Whole Indonesia 1,904,000 km2, Identified sites: 1,275 sites (74,976 MW), Selected projects through 2003: 67 schemes 6,310 MW
And continuation study on 5 selected schemes.

MP
FS

1981-1983
1983-1987

Indonesia

ADB
Government/ADB

Tulungagung Area Flood Control and Drainage

Flood drainage: Main drainage canal 24.2 km, diversion tunnel 1.1 km, 7.5 m in dia., 530 m3/sec., Land reclamation: Net benefited area for paddy cultivation: 12,930 ha (swamp area: 3,000 ha) 183.3 km

FS, DD
CS

1978-1979
1980-1987

Indonesia

JICA

Widas Flood Control and Drainage

Flood control and drainage improvement including dredging works: River channel improvement: 81.8 km, Flood diversion channel: 2.9 km, 3 controllable retarding basins: 23.5 MCM, design probable flood: 25 years

MP

1984-1986

Indonesia

Government/IBRD

Madiun - Solo Groundwater Development

Groundwater exploitation in Madiun area
Irrigation: 250,000 ha

FS
DD, CS

1972
1978-1986

Indonesia

JICA

North Banten Water Resources Development

Master plan: Study area: 3,550 km2
Irrigation: 3 schemes, 63,230 ha
Municipal water supply: 114,400 m3/day
Industrial water supply: 83,000 m3 /day flood control

MP, FS

1982-1983

Indonesia

Government/IBRD

Upper Jatiluhur and Coastal Strip Water Resources Development

Irrigation (Upper Jatiluhur area): 61,770 ha, fishpond development (coastal strip area): 45,000 ha, flood control and river improvement

FS

1981-1983

Indonesia

Government/IDA

Jatiluhur Irrigation Extension

Land reclamation, flood control, irrigation and drainage facilities.
Irrigation: Net area 51,000 ha, secondary canals 270 km, tertiary canals 500 km (swamp area reclamation: 4,000 ha)

DD, CS

1975-1983

Indonesia

JICA

Central South Sulawesi Overall Water Resources Development

MP

1978-1980

Indonesia

Government/JBIC

Kali Porong River Improvement

River channel improvement: 50 km
Gated weirs: overflow-type height, 11 m Crest length, 150 m and river bed dredging

FS, DD, CS

1963-1977

Indonesia

Government
JICA

Bengawan Solo River Basin Development

MP, DD
S

1963-1965
1972-1974

Indonesia

FAO/UNDP

Southeastern Sumatera Land and Water Resources Development

MP, FS, DD

1972-1973

Indonesia

Government/
JICA

Kali Brantas River Basin Development

MP
FS

1959-1961
1971-1972

Indonesia

JICA

Barito River Basin Development

MP

1970-1971

Indonesia

Government/JBIC

Lampung and South Sumatera Provinces Land and Water Resources Development

MP

1964-1967

Indonesia

Government/JBIC

Lodoyo Sand Conveyer System

S, D

1962-1965

Indonesia

JICA

Larona River Basin Hydropower

S

1964

Malaysia

JBIC
Government/JBIC

Pahang-Selangor Raw Water Transfer

Transfer water scheme for Pahang State to Selangor State to overcome the shortage of water resources to the States of Selangor, Kuala Lumpur, and Negeri Sembilan.
Transfer Tunnel: L=43,700 m, Diameter=4.8 m

SAPROF
DD

1999
1999-2000

Malaysia

JICA

Peninsular Malaysia Small Reservoir Development

Small reservoir development
Study area: 400,000 ha

FS

1993-1995

Malaysia

JICA

Penang Island Flood Damage Mitigation and Drainage Improvement

Flood damage mitigation and drainage improvement in Penang Island up to year 2000 (Study area: 285 km2).

MP, FS

1989-1991

Malaysia

JICA

Kelantan River Basin Flood Mitigation

Comprehensive flood control in Kelantan river basin up to year 2010.
Design flood: 50-year flood, 10,650 m3/s
Study area: 13,000 km3

MP, FS

1988-1989

Malaysia

JICA

Kelang River Basin Flood Damage Mitigation

Basin-wide flood damage mitigation (1,425 km2) covering Kuala Lumpur metropolitan area and adjacent cities to year 2005, and feasibility study for identified urgent schemes.

MP, FS

1987-1989

Malaysia

Private Company

Sg. Selangor Water Supply

1st phase water supply: 6,000,000 m3/day
2nd phase water supply: 6,000,000 m3/day

S

1985

Malaysia

JICA

South Johor Water Resources Development

Development of municipal water supply, irrigation, flood control, and environmental conservation.
Study area: 19,140 km2

MP

1984-1985

Malaysia

JICA

Perlis, Kedah and Plau Pinang States Water Resources Development

Ccomprehensive water resources development to year 1995-2000. The study aimed to prepare an integrated water resources development and management plan to meet a projected total water demand, 709 million m3 for domestic and industrial water and 2.2 billion m3 for irrigation.
Study area: 11,330 km2

MP, FS

1982-1985

Malaysia

Government/JBIC

Reman Reservoir

Reservoir schemes for trans-basin irrigation, municipal and industrial water supply in Perlis, Kedah, and P.Pinang States.
Main Dam: Rockfill, H=40 m, Crest length=170 m, V=28,600 m3
Water supply: 364,000,000 m3/year

FS

1983-1984

Malaysia

JICA

National Water Resources Study

Preparation of nationwide water resources development plan and national-level master action plan (legal and institutional) to year 1995-2000.
Study area: Entire Malaysia 330,000 km2

MP

1979-1982

Philippines

Government/JBIC

Kamanava Area Flood Control and Drainage System Improvement Project

Works Proposed in Northern Area of Malabon River
- Construction of Polder Dike
- Raising of River Wall
- Construction of navigation Lock
- Construction of Independent Flood Gates
- Construction of Control Gates
- Construction of Pumping Station with ancillary Flood Gates
- Construction of Pumping Station without Flood Gates
Works proposed in Southern Area of Malabon River
- Raising of River Wall
- Construction of Independent Flood-Gate
- Construction of Pumping Station with ancillary Flood Gates
- Improvement of Existing Drainage Channels
- Construction of New Drainage Channels

DD, CS

2000-2006

Philippines

JICA
Government/JBIC

Pinatubo Hazard Urgent Mitigation (I), (II)

Control and mudflow in the Abacan and Sacobia-Bamban River Basins and to carry out the feasibility study for the priority schemes, detailed design and supervision for the construction works.
(Phase I)
- Sacobia/Bamban River Improvement (D/D, C/S)
- Improvement of Bamban river: 32.3 km
- Reinforcement of sand pocket structures in Bamban river
- Channel excavation of Sacobia river: 5 km
- Improvement of Saban, Kauyan rivers: 2.65 km
- Rehabilitation of two bridges and National Route No.2
- Agriculture Development in Sand Pocket Area (F/S)
- Improvement of Pasig, Poretoro Rivers (F/S)
(Phase II)
1) Detailed Engineering Design of the following sub-project
- Dredging in the Delta Area
- Raising of Southwest Megadike
- Closure Dike (Phase I)
- Sapang Labuan River/Baluyot Channel Realignment
- Pilot Channel Dredging and Third River
- Realignment of San Francisco to Sasmuan Channel
2) Pre-construction and construction-supervision of the following sub-projects
- Repair of Damaged Southwest Corner of Megadike
- Raise Southwest Megadike
- Closure Dike
- Reinforce Baluyot Channel West Bank
- Raise the Sta. Barbara Bridge Approach
- Baluyot Channel Excavation
- Sapang Labuan River/Baluyot Channel Realignment
- San Fenando-Sto. Tomas Minalin Tail Dike
- Bacolor Tail Dike/Evacuation Road
- Dredging of Delta Area
- Pilot channel Dredging and Third River
- Downstream Channel Passing Sasmuan
3) Monitoring and Planning of Flood Control Works in the Pasac Delta (including the Porac-Gurnain River Basin) and Third River Channel

MP, FS
DD, CS (I)
DD, CS(II)

1993-1996
1997-2000
2000-2003

Philippines

Government/JBIC

Lower Agusan Basin Development-Flood Control Component

(Stage I, Phase I)
Construction of flood control facilities and land improvement works in West (Left) Bank of Butuan.
(Stage I, Phase II)
Construction of flood control facilities and land improvement works in East (Right) Bank of Butuan City, and construction of Magsaysay viaduct.
Dike: 12.4 km
Drainage system: 33.3 km
Dredging: 1,100,000 m
Land Improvement: 248 ha

DD
CS (I)
CS (II)

1982-1983
1989-1999
1998-2003

Philippines

JICA

The Flood Control Project for the Lower Cagayan River

Feasibility study of the Lower Cagayan River Flood Control to improve the socio-economic status of the area through mitigation of flood and reduction of flood damages

FS

2000-2002

Philippines

JICA

The Study on Water Resources Development for Metro Manila

Formulation of a Master Plan on water resources development in the Agos River Basin (including Kanan and Kaliwa River Basins) to supply domestic/municipal and industrial water to Metro Manila, and feasibility study on the priority project(s) selected from the master plan.

MP, FS

2001

Philippines

JICA
Government/JBIC

Pampanga Delta Development

Irrigation Component (11,540 ha)
Diversion weir: Combined fixed and movable type, 18.92 MCM
Main, lateral and secondary canals: 162 km
Flood Control Component: River channel improvement: Sulipan to Manila Bay 22.7 km
Construction of Labangan Floodway: Calumpit to Manila Bay; 16.9 km
Construction of new channel: Pampanga river=Labangan floodway; 4.8 km

FS
DD
SAPI
CS (Fl.)
CS (Irr.)

1980-1981
1987-1989
1995-1996
1991-2000
1992-2001

Philippines

JICA

Study on Comprehensive Disaster Prevention around Mayon Volcano

Formulation of master plan on the disaster prevention for the Mayon Volcano Area and execution of feasibility study on the urgent and/or priority projects which was selected from the master plan.

MP, FS

1998-2000

Philippines

Government/JBIC

Flood Forecasting & Warning System for Dam Operation-I & II

Establishment of telemeterized FFWS for dam operation to provide additional information for the safe and effective operation and management of major dams in Luzon and to forewarn the inhabitants in the flood plains downstream of these damsites of impending releases through the spillways.
Construction of PAGASA Data Information Center

DD, CS
SAPS

1983-1994
1998-1999

Philippines

JICA

Master Plan Study on Water Resources Management

Formulation of master plan on water resources development and management in the twelve water resources regions of the Philippines.

MP

1997-1998

Philippines

JBIC

Groundwater Irrigation

Survey on existing irrigation facilities in Tarlac Province and establishment of TOR on implementation plan.

SAPS

1996-1997

Philippines

Private Company/WB

National Urban Sewerage and Sanitation Strategy Plan and Feasibility Studies

Preparation of national strategy and action plan for the sewerage/sanitation in urban areas.

MP, FS

1992-1993

Philippines

Government/IBRD

Luzon Island Small Hydroelectric (10 sites)

Preparation of general tender documents for small hydropower schemes in Luzon Island (10 sites, 565 MW in total).

FS

1991-1992

Philippines

Government/JBIC

North Laguna Lakeshore Urgent Flood Control and Drainage

Habitual flood damage mitigation in East and West Mangahan areas along North Laguna Lakeshore.
Project area: 37 km2

DD

1991-1992

Philippines

JICA

Metro Manila Flood Control and Drainage Improvement

Medium-term (year 2000) and long-term (year 2020) flood control and drainage improvement in Metro Manila (Study area: 636 km2), and study for urgent schemes selected.

MP, FS

1987-1990

Philippines

JICA

Luzon Island Hydropower Potential Study

Hydropower project inventory (144 schemes, 5,130 MW, 22,503 GWh/year), elimination screening and preparation of promising hydropower project catalogue and master action program for orderly development to year 2005 and establishment of computer programs and data bank system. (Study area: 5 regions, 10,500 km2).

MP

1985-1987

Philippines

JICA

Cagayan River Basin Water Resources Development

Comprehensive basin development to year 2005.
Catchment area: 27,300 km2
5 flood control dams and river improvement, irrigation(77,542 ha in total), power (934 MW in total), and water supply (923,000 m3/day)

MP

1985-1987

Philippines

JICA

Panay River Basinwide Flood Control

Flood control and river improvement (150 km), flood plain management system (340 km2), flood forecasting and warning system, irrigation (2 schemes 5,400 ha), water supply (Roxas City 7,450 m3/day), and power (7,100 kW).

MP, FS

1983-1985

Philippines

JICA

Mayon Volcano Sabo and Flood Control

Sabo dams: 3 river basins, 11 sites
River improvement: 3 river channels, 76 km
Flood damage mitigation: 113 km2
Irrigation: 8,750 ha

MP

1979-1983

Philippines

Government/JBIC

Nationwide Flood Control

Master plan for flood control and river improvement of all major and secondary river basins in the Philippines.
Project target year: 2000

MP

1980-1982

Philippines

Government/JBIC

Nationwide River Dredging II

Planning and recommendation of long term river improvement and dredging program for flood control on 12 major rivers, and technical advice for dredging works.

MP

1980-1982

Philippines

JICA

Pasig Potrero River Flood Control

FS

1977-1978

Philippines

JICA
Government/JBIC

Urgent Rehabilitation and Improvement Works for Agno River Flood Control (Phase I & II)

Formulation of overall and systematic control plan on the Agno river and its adjoining river basins covering an area of 7,500 km2 and identification of priority projects for flood control plan.
Phase I: Lower Agno River and Upper Sinocalan River
Phase II: Upper Agno River
Agno River (24.5 km); Bayambang stretch with Poponto retarding basin to the upstream end
- Improvement of Bayambang stretch 3.4 km
- Improvement of Poponto floodway 9.1 km
- Improvement of upper Agno stretch 12 km
Pantal-Sinoalan River (52 km); Downstream stretch to protect Dagupan town area
- Improvement of Pantal-Sinocalan 18 km
- Improvement of Dagupan (back levee) 22 km
- Improvement of Ingalera

MP, FS
DD
CS (I&II)

1988-1991
1992-1994
1996-2006

Bangladesh

JICA

North West Region Flood Protection and Drainage Improvement