Country |
Client/Finance |
Project |
Services |
Period |
|
Cambodia |
JICA
Government/Grant |
The Project for Rehabilitation of National Road No. 7 (Kompong Cham
Section)
Rehabilitation of two bridges (Moat Khmung Bridge and Mream Treak
Bridge) and road along Route No. 7 from the east side of Mekong River
around the Mekong River Bridge construction area to Thnal Totoeng (11.5
km). |
BD
DD, CS |
2000-2001
2001-2004 |
|
Cambodia |
JICA
Government/Grant |
Construction of Mekong Bridge
Main bridge: 1,000 m (80 m+7@120+80 m), 12.6 m in width, PC 9 span
continuous box bridge
Approach bridge: 360 m in total length (PC continuous connecting girder)
Access road: 2,237 m in total length |
FS, EIA
BD
DD, CS |
1995-1996
1996
1997-2001 |
|
Cambodia |
JICA |
Siem Reap Airport Improvement Project
Expansion and rehabilitation of existing airport in Siem Reap. Basic
design study for implementation of the project with financial assistance
of Japanese Grant Aid including traffic demand forecast, social and
natural environmental survey. |
BD |
1997 |
|
Cambodia |
Private Company |
Transportation Sector Study for Reconstruction of Cambodia
Study and investigation on road, bridge, ferry and port facilities. |
S |
1992 |
|
Lao PDR |
JICA |
Basic Study on the Roads and Bridges in Indonesia Area
The study aims to evaluate the direct and indirect impacts and effects
the construction of roads and bridges in the three Indochina countries has
had in the area, and to analyze the acquired data for further reference in
preparing future basic designs for Japanese Grant Aid. |
S |
2002 |
|
Lao PDR |
JICA
Government/Grant |
Pakse Bridge Construction
Construction of the bridge crossing the Mekong River and access road at
Pakse.
bridge length: 1,380 m
Bridge type: Continuous rigid frame PC box girder
Access road length: 3,030 m |
FS
BD
DD
CS |
1995-1996
1996
1996-1997
1997-2000 |
|
Lao PDR |
JICA
Government/Grant |
National Route 13 Road Betterment and Bridge Rehabilitation
North-south back-bone of highway network in the country, total length
1,245 km (from Luang Prabang to the Cambodian border) and 39 bridges
required reconstruction. |
BD
DD, CS |
1993-1994
1995-1997 |
|
Lao PDR |
JICA
Government/Grant |
Vientiane International Airport Extension
Runway extension: 3,000 m, holding apron improvement: 213,120 m2,
apron improvement: 2,052 m2, new exit taxiway: 600 x 23 m x 2,
parallel taxiway extension: 440 m x 23 m |
S, DD, CS |
1968-1972 |
|
Myanmar |
Private Company |
Intersection Improvement in the City of Yangon
Conceptual study for improvement of the Pyay/Insein/Hledam/University
Roads Junction to cope with expected traffic growth.
Elevated section: L=2,300 m in total |
S |
1995 |
|
Myanmar |
JICA |
Irrawaddy Bridge
|
FS |
1974-1975 |
|
Thailand |
Government/JBIC |
Second Bangkok International Airport Project, Ground Improvement -
Phase II
・ Ground
Improvement Works for the Landslide Road System
・ Ground
Improvement Works for East Runway/Taxiway and Cargo Aprons. |
CS |
2001-2004 |
|
Thailand |
Government/JBIC |
Map Ta Phut Industrial Port Phase I&II
Review of existing studies, preparation of detailed drawings and
supervision of construction for the phase I area, and management of
construction for the phase II area selected from the designed second phase
development area.
Inner Basin (-12.5 m): Multipurpose Terminal (2-Berths), Liquid-cargo
Terminal (2-Berths), Shell/Client Terminal (10-Berths)
Outer East Basin (-15.5 m - 17.5 m): Soyang Chemical Terminal (2-Berths),
BCP/IPP Terminal (1-Berth) |
DD, CS
S
DD
CS, OM |
1984-1992
1991
1994-1995
1996-2001 |
|
Thailand |
JICA |
Second Mekong International Bridge Construction Project
Detailed design and preparation of tender documents for construction of
international bridge crossing the Mekong river between Mukdahan, Lao PDR,
and Savannakhet, Thailand Bridge (1.4 km, Extra Dosed), Access road,
Revetment, Immigration facilities. |
DD |
1999-2000 |
|
Thailand |
JETRO |
Outer Bangkok Ring Road (Southern Portion) Construction Project
Review of the engineering, economic feasibility study and the
environmental impact assessment of the Southern Bangkok Outer Ring Road.
L=941 m (Cable-Stayed Bridge) |
FS |
1999-2000 |
|
Thailand |
Government/JBIC |
Outer Bangkok Ring Road (Eastern Portion) New Highway
Review of detailed design and construction supervision of 64 km long
(divided 4-lanes) new motorways including 8 grade-separated interchanges
which connect eastern suburbs of Bangkok. |
CS |
1994-1999 |
|
Thailand |
Private Company
(Rayong Olefins Co., Ltd.) |
Rayong Olefins Port Development
Carried out a conceptual design of the RTT jetty for Rayong Olefins
Co., Ltd., as the step I of the port development.
Also carried out the detailed design stage as step II, and construction
supervision for step III for the port development.
Berth No. 1: 100,000 DWT
Berth No. 2: 20,000 DWT |
S
DD
CS |
1995
1996-1997
1997-1998 |
|
Thailand |
Private Company |
Golden Gateway Project
Preparation of technical pre-feasibility study to determine the
suitable location for construction of deep sea port (200,000 DWT) in
Bokpyin area, the suitable way for construction of land bridge. |
S |
1997 |
|
Thailand |
JICA |
Lampang-Chiang Mai Motor Way
Preparation of detailed engineering design for construction of the 32
km length motor way including two tunnels.
Bridge: 290 m, Viaduct: 9.4 km in total, Interchange, Tunnel: 3.8 km + 0.7
km |
DD |
1996-1997 |
|
Thailand |
Private Company |
Malaysia-Thai Landbridge Project
Feasibility study for the development of Long Kawi Port and Song Khla
Port for the future possible site of gateways connecting the Gulf of Siam
and the Andaman Sea. |
FS |
1996 |
|
Thailand |
Private Company (Thai LNG Power Corporation) |
Map Ta Phut Port Phase-3 Development
Assistance in tender evaluation for construction of the port and
related structures for handing LNG. |
DD |
1996 |
|
Thailand |
Private Company |
Investment Study on Map Ta Phut Port
Preliminary engineering and economic study on the land reclamation at
Map Ta Phut Port, including outline estimate of land cost on rental basis. |
S |
1995 |
|
Thailand |
Private Company |
Marine Facility for Banpu Port
Port and reclamation study for establishment of IPP complex to conduct
bidding including outline design of coal unloading berth and coal
unloading and storage conveyor plans. |
S |
1995 |
|
Thailand |
JICA |
Inter-Urban Toll Expressway Construction
Lampong~Doi Saket: 98.2 km
Bon Pong~Cha Am: 133.8 km |
FS |
1993-1995 |
|
Thailand |
Private Company |
Caltex Refinery Reclamation
Development of the land for port development
Reclamation fill: 12,000,000 m3
Revetment: 4.5 km |
DD |
1992-1994 |
|
Thailand |
Private Company |
Industrial Port Concentrate Unloading Berth and Storage Facility for
Padaeng Industry Port (Map Ta Phut Port)
Copper smelter berth to unload materials and to ship out copper import
with annual shipment of 1.0 million tons (Jetty: 60,000 DWT x 1, 10,000
DWT x 1)
Cool water supply system and Heat-effuent discharge system with a intake
capacity of 8.9 m3/sec.
Unloader: one unloader on wharf
Vessel Size: maximum vessel size: 30,000 DWT
Wharf for Acid Storage: Wharf for approx., 1,000 DWT vessel |
S
DD, CS |
1991
1992-1994 |
|
Thailand |
Private Company |
National Fertilizer Port for Map Ta Phut Port
Fertilizer plant berth to unload materials and ship out fertilizer with
annual shipment of 2.0 million tons.
Jetty: 60,000 DWT x 1, 30,000 DWT x 1
Cargo Equipment: Bucket-unloader x 1, Belt conveyor system |
S |
1992 |
|
Thailand |
Private Company |
Puratchap Port Construction
Review on Port Detailed Design, focusing on the stability of
breakwater, alignment of berth and breakwater and overall project
implementation, including cost, construction period and tender documents. |
S |
1992 |
|
Thailand |
JICA |
Nationwide Inter-Urban Toll Motorway Development
Toll expressway network from the view point of national and regional
development, toll road system and organization for implementation and
operation and examine socio-economic development effect.
Study area: 540,000 km2 |
MP |
1990-1992 |
|
Thailand |
JICA |
Central Region Road Development
Overall road network development in 26 provinces, Central Region.
Trunk highway network 6 routes, 238.6 km
Supplemental road network 14 routes, 403.4 km |
MP, FS |
1987-1989 |
|
Thailand |
Government/JBIC |
Bangkok International Airport Expansion
Expansion of apron, passenger and cargo terminal buildings, fire
station and all other associated utilities and facilities
Runway: 3,700 m x 60 m, Taxiway: 2,100 m x 23 m - 30 m, Parallel taxiway:
2,900 m x 28 m, Apron: 763,000 m2 (expansion and overlay),
Terminals: 291,000 m2, Parking area: 110,000 m2
(3,000 cars), and related facilities, Diesel: 1,000 kW x 4 nos., 850 kW x
3 nos., 500 kW x 1 no. |
DD, CS |
1980-1989 |
|
Thailand |
Government/JBIC |
Productivity Road Program-Stage III
Nong Bua-Ban Lup Pho productivity road: 162.6 km, 8 other productivity
roads: 300 km |
CS |
1986-1988 |
|
Thailand |
JICA |
New Krung Thep Bridge Construction and Thonburi Road Extension
Bangkok metropolitan highway bridge across Chao Pharya river.
PC box girder, 2,093 m long, 17.9 m wide |
FS |
1986-1987 |
|
Thailand |
Government/JBIC |
New Flyover Bridge and Approach Road Construction for Bangkok
International Airport
Bridge: L = 500 m (with 1 junction), W = 6 m (1 lane ) + 1.5 m
(pedestrian)
Crossing over Vibhavad-Rangsit highway
Approach: L = 80 m, W = 6 m (1 lane)
Traffic capacity: 1,820 vehicles/h
Substructure: Reinforcement Concrete Pier with PC pile
Superstructure: PCI girder bridge deck |
DD, CS |
1984-1987 |
|
Thailand |
JICA |
Northern Region Road Development
Master plan: Short/medium-term development: 31 links 862.1 km,
long-term development: 13 links 325.7 km (170,000 km2, 16
routes, 409.3 km), and feasibility study (14 routes, 417.2 km |
MP, FS |
1980-1982 |
|
Thailand |
JICA |
Nong Bua-Ban Lam Chi Bon Highway
Improvement: 41.9 km, new road construction: 112.8 km |
FS |
1979-1980 |
|
Thailand |
JICA |
Phetchabun-Chai Badan Highway
|
FS |
1978-1979 |
|
Thailand |
Japanese Government, Mekong Committee |
Nong Khai-Vientiane Bridge
|
S |
1968-1969 |
|
Vietnam |
Government/JBIC |
Hai Phong Port Rehabilitation Project
Phase I
Wharf: 10,000 DWT x 15
Cargo Equipment: Transfer crane system, Various marshaling yard equipment,
including, folk-lift-trucks and mobile cranes
Civil Works: Transit shed/CFS, Bank protection, Pavement expansion,
Sub-soil improvement, Revetment/Embankment
Phase II
Container Terminal in Chua Ve Port: 2 berth, reclamation, pavement, road,
buildings, utilities
Channel Improvement Work: D=-5.5 - 5.7m, levee, protection work
Operation and Maintenance Training Program |
FS
DD, CS
DD, CS |
1993
1995-2000
2000-2005 |
|
Vietnam |
Government/JBIC |
Hai Van Pass Tunnel Construction
Tunnel
6,274 m long, 10 m width
Ventilation System
Jet-Fan longitudinal system
Bridge
8 bridges (1,653 m in total length), precast post-tensioned concrete
I-girder and cast-in-place concrete pile foundation for the Lang Co
Bridge, spread footing for the other 7 bridge
Highway
4,273 m in total length |
S, DD, CS |
1998-2003 |
|
Vietnam |
JICA
Government/JBIC |
Cai Lan Port Expansion
A new port development in north Viet Nam to substitute for Hai Phong
Port that suffers from heavy siltation in the river channel. Planned cargo
traffic of 7 million in 2010, including container cargo.
Jetty: 10,000 DWT x 5, 20,000D |
MP, FS
DD, CS |
1993-1995
1997-2003 |
|
Vietnam |
Government/JBIC |
National Highway No. 10 Improvement Project
Improvement of National Highway No. 10 from Bi Cho to Ninh Binh.
<Highway>
- Length: 154 km
- Width: 12~25 m
- Design speed: 80/60/40 km/hr
<Bridge>
33 bridges, 6.3 km in total length |
DD, CS |
1998-2002 |
|
Vietnam |
JETRO |
Da Nang - Hue Bypass
Da Nang City - Hue City: 60 km |
FS |
2000-2001 |
|
Vietnam |
JBIC |
Tan Son Nhat International Airport Technical Development
Review the existing F/S so that the Project can be matured as Yen Loan
Project through clarification of the following:
- Justification on development of the Project in relation to the new
airport development plan,
- Appropriateness of the facility requirements in relation to the logical
phasing of development of the existing and new airports,
- Measurement of effect of the Project together with its monitoring plan,
economic and financial viability of the Project as well as financial
performance of the SAA after implementation,
- Negative environmental impacts by the Project. |
SAPROF |
2000-2001 |
|
Vietnam |
JICA |
Can Tho Bridge Construction Project
Construction of Can Tho Bridge over the Mekong river including approach
roads.
Main Bridge (Hau River): 1,040 m, Cable-Stayed Bridge
Approach Bridge: Vinh Long side 350 m, Can Tho side 1,225 m
Approach Road: Vinh Long side 5,000 m, Can Tho side 6,900 m |
FS
DD |
1997-1998
1999-2000 |
|
Vietnam |
JBIC |
Road Infrastructure Development Project in Ho Chi Minh City
Study and investigation on Ho Chi Minh City transportation
infrastructure development master plan including canal-side road
improvement and Saigon river crossing tunnel construction.
Canal-side road: L=13 km, 4 interchange, 14 new bridges (L=1,112 m in
total)
Saigon river crossing tunnel: L=1.96 km, immersed type access road 6.34 km |
SAPROF |
1999 |
|
Vietnam |
Government/JBIC |
National Highway No. 1 Bridge Rehabilitation
36 bridges (2,280 m in total length) along the National Highway No. 1
(Asian Highway). |
DD, CS |
1994-1999 |
|
Vietnam |
Private Company |
Tan Thanh Port Development
Review and update of existing feasibility study for confirming the
project viability as BOT project. |
S |
1997 |
|
Vietnam |
Private Company |
Thang Long Cargo Distribution Center Project
Formulate and evaluate, on a preliminary basis, the Thang Long Cargo
Distribution Center.
Project area: 5 km north of the Hanoi City |
S |
1997 |
|
Vietnam |
Private Company |
Saigon Port Extension Preliminary study
Wharf: 15,000 DWT berth x 4, -10.0 m deep x 800 m long, 40,000 ton
transit shed, 1,200 tph unloading system |
S |
1974, 1989 |
|
Vietnam |
Government |
My Thuan (Vinh Long) Construction Bridge
|
S, DD |
1965-1966 |
|
East Timor |
UNOPS |
Urgent Rehabilitation Project of Restoration of Navigation Aids and
Fender System at the Port of Dili
Detailed design, assistance to tendering process, and construction
supervision for rehabilitation of navigation aids and fender system. |
DD, CS |
2000-2001 |
|
East Timor |
JICA |
Study on Urgent Rehabilitation Plan
Formation of urgent rehabilitation plan for roads, bridges, ports,
irrigation and power of East Timor in order to contribute UNTAET's
infrastructure rehabilitation plan. |
S |
2000 |
|
Indonesia |
Government/JBIC |
Urgent Bali Beach Conservation
24 groins; 104,250 m3, 3 offshore breakwaters; 8,000 m3,
2 submerged breakwaters; 11,400 m3, 4 headlands; 101,000 m3,
artificial reef; 27,900 m3, littoral nourishment; 1,030,000 m3
environment conservation |
DD
CS |
1991-1993
1997-2004 |
|
Indonesia |
JBIC |
Infrastructure Rehabilitation Projects (Package C)
The purpose of the project is to examine seven projects in the water
resource and irrigation sector and two projects in the port sector. These
were all found to be in need of rehabilitation in the previous study
packages A and B of completed infrastructure projects financed by ODA
loans.
The present study will provide support for adopting specific measures and
putting in place supervisory arrangements in implementing rehabilitation
work aimed at strengthening project operation, maintenance and control. |
SAPS |
2001 |
|
Indonesia |
Government/JBIC |
Road Rehabilitation Project III
Project management support, consulting services for construction
supervision and transfer of technology of rehabilitation works for about
1,500 km of roads which consist of pavement improvement by overlay and
improvement of shoulders and side drainage ditches in 8 provinces of
Sumatra and West Java. |
DD, CS |
1994-2000 |
|
Indonesia |
Government/JBIC |
Ujung Pandang Port Urgent Rehabilitation
Detailed design and construction supervision of container terminal and
multi-purpose berth including container marshaling yard, CFS, maintenance
shop, administration building etc.
The container terminal of Hatta Quay has planned to handle 600,000 TEU/yr.
Container Berth 670 m x -10.0 m
Multi-purpose Berth 180 m x -10.0 m
Container Yard 130,000 m2
Dredging 1.6 mill. cu.m
Reclamation 2.1 mill. cu.m |
DD, CS |
1992-1999 |
|
Indonesia |
Government/ADB |
ADB Eleventh Road-Road Betternment and Bridge Replacement Program
Construction of 127 bridges comprising in excess of 5,000 lineal meters
and upgrading of existing national and provincial roads totaling some
2,300 km throughout the 13 provinces. |
CS |
1992-1997 |
|
Indonesia |
Government/JBIC |
The Urgent Rehabilitation of Ferry Terminals in East Java and Bali
Island
Construction, rehabilitation, and maintenance of 5 ferry terminal
facilities:
Ujung Terminal 650 GT x 1B
Kamal Terminal 650 GT x 1B
Ketapang Terminal 2,000 GT x 2B
Gilimanuk Terminal 2,000 GT x 2B
Padang Bai Terminal 1,000 GT x 1B |
DD, CS |
1991-1997 |
|
Indonesia |
Private Company |
Container Terminal Development in Batam Island Project
Pre-investment study including review of container tariff system and
set-up of financial analysis base.
Phase I: 1998, Vessels 1,400,000TEU, L=2,100m, D=15m
Phase II: 2002, Vessels 2,025,000TEU, L= 3,000m, D=15m
Phase III: 2015, Vessels 3,000,000TEU, L=3,000m, D=15m |
S |
1994-1996 |
|
Indonesia |
Government/ADB |
Flores Emergency Reconstruction (Roads and Bridge Component)
Emergency reconstruction of road and bridges damaged by earthquake in
Flores 4 provinces.
Road length: 337 km in total
Bridge: 15 (314 m in total) |
DD, CS |
1994-1995 |
|
Indonesia |
Government/JBIC |
First Nine Provinces Road Rehabilitation
Project management support, technical support and training/transfer of
knowledge support for the urgent rehabilitation of the existing national
and provincial highways in 9 provinces of Sumatra and West Java.
19-national highway sections: 668.8 km
23-provincial highway sections: 873.9 km |
CS |
1990-1993 |
|
Indonesia |
Government/ADB |
Local Development Project, Rural Roads II - Bali and West Nusa Tenggara
Provinces ADB Eighth Road
Technical advisory services, construction supervision and equipment
management.
Total road length: 2,370 km including 1,000 bridges |
CS |
1987-1992 |
|
Indonesia |
Government/ADB |
Access Channel Optimization Study and Review for Master Plan of Benoa
Port
Review and updating of existing master plan for Benoa port development. |
MP, FS |
1990-1991 |
|
Indonesia |
JICA |
Surabaya-Mojokerto Toll Road
Construction of 39 km long toll road section in East Java. |
FS |
1990-1991 |
|
Indonesia |
Government/JBIC |
South Sumatera Road Rehabilitation
Road improvement between Lubuklinggau and Kotabumi.
(Total road length 467.4 km, bridge replacement 26 sites, landslide
protection 13 sites) |
DD, CS |
1987-1991 |
|
Indonesia |
JBIC |
Semarang Port Development
Post construction appraisal and project sustainability study. |
S |
1990 |
|
Indonesia |
ADB |
Medan Urban Transportation Study
Integrated multi-modal urban transport development and management in
Medan metropolitan region, including preparation of urban road improvement
and traffic management action plan and public transport improvement action
plan, and establishment of urban transport data base. |
MP, FS |
1989-1990 |
|
Indonesia |
Government/IBRD |
First JABOTABEK Urban Development
Prondok Pinang-Pejompougan highway: Section I, IIA.B 5,700 m in total
Pasarminggu-Depok highway: 16,800 m
Outer ring road: Section I, II 9,720 m in total
Traffic management plan:
Harmoni flyover: 470 m, Kebayoran Lama Road section: 2,000 m,
Environmental impact study: Pasar Mingu-Depok section |
DD |
1988-1990 |
|
Indonesia |
Government/JBIC |
Jakarta Intra-Urban Tollway
Jakarta intra-urban highway systems including 3 flyover portions
between Tamana Ria Senayan and Grogol.
Relocation and widening: 3.3 km in total length |
CS |
1987-1990 |
|
Indonesia |
Government/JBIC |
Jakarta Outer Ring Road
Intra-urban ring highway systems including interchanges in Jakarta
metropolitan area.
Total highway length: 55 km |
FS, DD |
1987-1989 |
|
Indonesia |
JICA |
Inter-island Multimodal Traffic Demand Forecasts and Air Transport
Development Plan
Inter-and intra-island traffic demand forecasting and nationwide air
transport development plan including identification and basic
specification of potential new air routes, aircrafts, airports and navaids. |
MP |
1986-1988 |
|
Indonesia |
Government/JBIC |
Muarabungo-Lubuklinggau Highway
Improvement and new road construction of 285 km trunk highway in
Sumatera (Asian Highway Route A-2). |
CS |
1978-1985 |
|
Indonesia |
Government/JBIC |
Lubuklinggau-Telukbetung Highway
Improvement of 590 km trunk highway in Sumatera (Asian Highway Route
A-2). |
DD, CS |
1975-1985 |
|
Indonesia |
Government/Japanese Government |
South Tulungagung Road Reclamation
Flood diversion: tunnel 950 m long, m dia., 500 m3/sec.,
Net benefited area for paddy cultivation: 3,000 ha |
FS, DD, CS |
1958-1961 |
|
Malaysia |
JICA |
The Study on Slope Disaster Management for Federal Roads
A road disaster management plan as well as an improvement plan of
current technical and institutional management system, based on the result
of field investigation along the study route and detailed analysis. |
MP, FS |
2000-2001 |
|
Malaysia |
JBIC |
The Study for Confirming Environmental Considerations on Electrified
Double-Tracking Railway Project between Rawang-Ipoh
The project aims to 1) Electrification and double-tracking of the
railway between Rawang and Ipoh whose route has a large amount of traffic
in Malaysia and extends about 175 km2) Improvement of
transportation efficiency, safety, and competitive power by introducing a
modernized signing & communication system. |
S |
2000 |
|
Malaysia |
JICA |
Nationwide Highway Bridges Rehabilitation, Improvement and Maintenance
Program
Rehabilitation, improvement and maintenance of 216 damaged bridges
identified in the National Axle Load Study.
Preparation of bridge inspection, maintenance and repairing manuals. |
MP, FS |
1990-1993 |
|
Malaysia |
Government/Private Company |
Kelang Container Terminal Expansion Project
Development of container terminal in Kedah Province.
Container terminal expansion along with reinforcement of marshaling
capacity up to 900,000 TEU/ year from 650,000 TEU/year (Jetty: 50,000 DWT
x 6 nos.). |
MP |
1992 |
|
Malaysia |
JBIC |
Crocker Range Crossing Highway-Tamparuli Ranau Road Disaster Control
and Management
Establishment of slope failure control and management system for
mountain highway improvement project.
H=71 km in total |
FS, DD, CS
SAPS |
1975 - 1982
1989-1990 |
|
Malaysia |
Government/JBIC |
Crocker Range Crossing Highway-Tamparuli Ranau Road Improvement
Improvement and new road construction of 72.2 km long Crocker Range
crossing road, a part of the trunk highway. |
FS, DD, CS |
1975-1982 |
|
Philippines |
Government/JBIC |
Mindoro West Coast Road Improvement Project
The project is composed of the following road sections and
flood/sediment control works to protect the road sections:
San Jose - Rizal Section; L=13.90 km
Sablayan - Sta. Cruz Section; L=55.10 km
Mamburao - Abra de Ilog Section; L=37.70 km
Total: L=106.70 km |
DD, CS |
1999-2005 |
|
Philippines |
Government/JBIC |
Social Reform Related Feeder Ports Development Project
Port Development of 36 Feeder Ports; detailed design and construction
supervision of port and related facilities, land development,
institutional development contributing to port management and utilization,
and post evaluation of the project impact and institutional development,
master planning of Nationwide Feeder Ports Development to assist the DOTC
(Department of Transport and Communication) in port development planning. |
MP, DD, CS |
1998-2004 |
|
Philippines |
Government/JBIC |
Catanduanes Circumferential Road Improvement Project
Project aims to provide a reliable and stable road system against the
"disasters" generated mainly by the fragile geology or the
rivers and to reduce transportation and maintenance costs and to ensure
the safety of road users.
Package I: Codon-San Andres-Virac-Viga (80.5 kms)
Package II: Viga-Bagamanoc (10.4 kms)
Package III: Bagamanoc-Pandan (47.5 kms)
Package IV: Pandan-Caramoran-Codon (66.4 kms) |
DD, CS |
2001-2003 |
|
Philippines |
Government/JBIC |
Metro Cebu Development-Phase III
Arterial road network development within the context of the Metro
Cebu's urban development.
Cebu South Coastal Expressway: 4-lane, 10 km
Cebu South Reclamation: 330 ha
Cebu Circumferential Road: 2-lane, 18 km |
DD
CS |
1992-1993
1996-2002 |
|
Philippines |
JICA
Government/JBIC |
Rehabilitation and Maintenance of Bridge along Arterial Roads (I),
(II), (III) (IV)
Preparation of a rehabilitation program for 731 bridges
on Pan-Philippine Highway (470 km), establishment of bridge operation and
maintenance database, and construction of selected bridges for urgent
rehabilitation of bridges. |
FS
DD, CS |
1987-1989
1990-2001 |
|
Philippines |
Government/JBIC |
Sacobia and Bamban Bridges under Pinatubo Hazard Urgent Mitigation
Project
Sacobia Bridge
Type: Continuous plate girder, Length: 155 m (50m+55m+50m), Width: 8.6 m,
Foundation: Precast RC Piles, Cast-in-place RC piles
Bamban Bridge
Type:Nielsen, Length: 177 m, Width: 8.6 m, Foundation: Cast-in-place RC
piles |
DD, CS |
1997-2000 |
|
Philippines |
Government/JBIC |
LRT Line 1 Capacity Extension and LRT Line 2 Construction Project
Undertaking the review of the existing system, design for the capacity
expansion work of LRT line 1, design services for the construction works
of LRT line 2. |
BD, DD
CS |
1994-1996
1995-2000 |
|
Philippines |
JICA |
Project Formation Study on Standardization of LRT Network Integration
Study on railway facilities planing including railroad stations,
railways networks, and traffic signals. |
S |
1999 |
|
Philippines |
Private Company |
Ninoy Aquino International Airport Third Terminal
Technical Advisory Services to the Lender's due diligence mission for
finance to the BOT airport terminal project. Tasks were review of detailed
design, project agreements including EPC contract, O&M contract, and
EIA report. |
S |
1998 |
|
Philippines |
Government/JBIC |
Metro Manila Urban Transportation-Phase II (Northern Package)
Part of Metro Manila Urban Transportation Project including
improvement/widening/extension/construction of 5 sub-highway projects. |
DD, CS |
1990-1998 |
|
Philippines |
JBIC |
Feeder Port Project
Identification of the priority port development projects including
supporting infrastructure facilities and social services contributing to
development of hinterlands. |
SAPI |
1996 |
|
Philippines |
JICA |
Luzon Island Strategic Road Network Development
Islandwide arterial highway network development.
study area: National and provincial highways; 12,000 km. |
MP, FS |
1992-1993 |
|
Philippines |
Government/JBIC |
Kenon Road Disaster Prevention
Establishment and organization of disaster prevention system including
early warning and evacuation system for arterial highway between Manila
and Baguio (L=34.2 km, 2 Lane). |
DD, CS |
1989-1993 |
|
Philippines |
Government/JBIC |
Lipata Ferry Terminal Rehabilitation
Reclamation: 550 m3 within existing quaywall and revetment
Construction of new port facilities: Quaywall 65 m, bulkhead 35 m,
revetment 99 m |
CS |
1989-1991 |
|
Philippines |
JBIC
JICA |
Irene Port Development Project
Construction of multipurpose berths, regional port in north Luzon.
Cargo demand: 850,000 tons/year (2000)
Jetty: 20,000 DWT x 1
Wharf: 15,000 DWT general cargo berth, -10 m deep, 200 m long, open pile
type with steel pipes
Dredging: 700,000 m3 in volume
Storage facilities: Transit Shed (4,000 m2), Storage Yard
(23,000 m2) |
DD
DD |
1981-1982
1986-1987 |
|
Philippines |
Government/JBIC |
Manila North Road Improvement
Improvement and new road construction of 237 km long arterial highway
between Rosario and Laoag, Luzon.
Total highway length: 258 km |
DD, CS |
1979-1985 |
|
Philippines |
JICA |
Nationwide Ice Plants and Cold Storages Networks System (IPCS System)
Master plan study for establishment of ICPS System supporting
nationwide stable and efficient fish catching transportation and
distribution. |
MP |
1983-1984 |
|
Philippines |
Government/ADB |
Port of Brooke's Point Oceanographic Study
Oceanographic survey and planning for port improvement and expansion. |
FS |
1983 |
|
Philippines |
Government/JBIC |
Ferry Terminals Construction
Detailed design and construction supervision for four ferry terminals
along the Philippine-Japan Friendship Highway.
Wharf: 500 GT ferry berth 4, pier type, steel sheet pile type
Revetment: Rubble mound type, concrete block type, Access road, passenger
terminals. |
DD, CS |
1980-1983 |
|
Philippines |
Government/JBIC |
Philippine-Japan Friendship Highway Ferry Terminals
Integral part of Philippine-Japan Friendship Highway
4 terminals for 1,000 GT car ferries. |
DD, CS |
1980-1983 |
|
Philippines |
JICA |
Davao City Urban Transport Development and Land Use Planning
Medium and long-term urban transport development and land use planning
in Davao municipal area.
Project target year: 1990, 2000), Study area: 180 km2 |
MP |
1979-1981 |
|
Philippines |
JICA |
EAC Ferro-Silicone Factory Infrastructural Development
Ocean-going vessel berth (7,000 DWT): 75 m long, 8.5 m water depth
Inland barge berth (1,500 DWT): 56 m long, 4.5 m water depth |
FS |
1980 |
| Bangladesh |
DANIDA |
Technical Review of the Rural
Development Project RDP-16 Phase II The main
activities of RDP-16 Phase II are to:
rehabilitate and maintain a number of selected economically sustainable
transport networks and associated markets in the project area;
assist in the long term development of a sustainable local maintenance
capability;
develop a sustainable employment opportunities programme for targeted local
groups which will have a particular focus on Women in Development
activities.
Implementation of the project is carried out through the Local Government
Engineering Department (LGED) of the Ministry of Local Government Rural
Development and Co-operatives (MLGRDC). |
TR |
2001 |
|
Bangladesh |
JICA |
Construction of Revetment on the Bank of Meghna River
Revetment works on the Meghna Bridge site for protection for Meghna
Bridge against erosion and deposition. |
BD |
1997-1998 |
|
Bangladesh |
JICA
Government/Grant |
Meghna and Meghna Gumti Bridge Construction
Meghna Bridge
Type: PC box girder (max. span 87 m), Length: 930 Width: 9.2 m, Approach
road: 1,965 m in total length
Meghna-Gumti Bridge
Type: PC box girder (max. span 90 m), Length: 1,480 m, Width: 9.2 m,
Approach road: 1,430 m in total length |
FS
DD, CS |
1984-1985
1985-1996 |
|
Bangladesh |
JBIC |
Paksey Bridge Construction
Survey and investigation for construction of a highway bridge over
Ganges River (PC Box Girder, 1,800 m in length) |
SAPROF |
1993-1994 |
|
Bangladesh |
JICA
Government/Grant |
Construction of Revetment on the Bank of Meghna River
Protection of the existing revetment in Camille side to project the
Mooney Bridge and its access road against scouring. |
BD
DD, CS |
1992
1992-1993 |
|
Bangladesh |
JBIC |
Dhaka Container Terminal
Plan of construction of a container terminal (8 ha), general cargo
jetty (3 ha), and across road (4.8 km). |
SAPROF |
1992 |
|
Bangladesh |
JICA |
Dhaka-Narayanganj Container Terminal Development
Stagewise development of Dhaka port container terminal (1st stage
development scheme).
Annual throughput: Year 1995; 69,000 TEUs |
MP, FS |
1989-1991 |
|
Bangladesh |
Government/ADB |
Chittagong Port Land Reclamation Project
Land reclamation (70 ha) by dredging the estuary of Kamaphuli River,
consisting of 43 ha for fertilizer plant, 20 ha for housing lots and 7 ha
for jetty area.
Jetty: 15,000 DWT x 1
Civil Works: Yard pavement, Dredging/Reclamation |
CS |
1982-1983 |
|
Bangladesh |
JICA |
Jamuna Bridge
|
S |
1972-1975 |
|
India |
Government/JBIC |
National Highway No. 5 in Andra Pradesh State
Widening the existing two-lanes carriageway to four-lanes including
strengthening the existing pavement for a length of 79 km. |
CS |
1999-2002 |
|
India |
Government/JBIC |
National Highway No. 2 Improvement
Widening of the existing two-lanes section to four-lanes, improvement
of drainage facilities and construction of bridge (51.3 km). |
DD, CS |
1993-2000 |
|
India |
JICA |
Feasibility Study on National Highway Bypasses
Pre-feasibility study on bypasses improvement in proposed 10 cities and
feasibility study for high priority 3 bypasses.
Target year: 2002 |
FS |
1997-1998 |
|
India |
JICA
Government/Grant |
Nizamuddin Bridge Construction on NH-24
L=550.0 m, W=22.6 m
Prestressed concrete continuous I beam, Open caisson foundation
Approach road: 750 m in total length |
BD
DD, CS |
1994-1995
1995-1998 |
|
Nepal |
JICA
Government/Grant |
Construction of Sindhuri Road, Section II
Mountainous road construction project from Sindhuri Bazar to Khurkot
(39 km) |
BD
DD
CS |
1999
2000-2001
2000-2004 |
|
Nepal |
JICA |
Improvement of Intersections in Kathmandu City
The project aims at improving 10 intersections to improve the urban
traffic condition in Kathmandu city |
BD
DD |
2000-2001
2001-2002 |
|
Nepal |
JICA
Government/Grant |
Construction of Sindhuri Road, Section IV: Nepaltoc-Dhulikel
Construction of bridges access roads and causeways;
Bridges: 5 nos., W=4.25 m, L=244 m in total, prestress single line
Roads: 51 km
Causeway: 8 nos. |
BD
DD
CS |
1995-1996
1996-1998
1997-2002 |
|
Nepal |
JICA |
Kathmandu-Naubise Alternate Road Project
New road construction from Kathmandu to Naubise. |
FS |
2000-2001 |
|
Nepal |
JICA |
Improvement of Existing Air Traffic Services Equipment and System under
the Tribhuvan International Airport Modernization Project
Improvement of existing air traffic control system and equipment. |
S
DD, CS |
1999
1999-2001 |
|
Nepal |
JICA
Government/Grant |
Construction of Sindhuri Road, Section I: Bardibas-Sindhuli Bazar
Construction of bridges access roads and causeways;
Bridges: 9 nos., W=7.5 m, L=740 m in total, prestress single line
Access roads: 4,075 m
Roads: 37 Km
Causeway: 17 nos., 1,118 m in total |
BD
DD, CS |
1995-1996
1996-1998 |
|
Nepal |
JICA
Government/Grant |
Construction of New Bagmati Bridge at Thapathali
Construction of Composite Steel Plate Girder (L=138 m, W=13.5 m) and
approach road (336 m in total length), including removal of existing old
truss bridge, improvement of intersection at Thapathali, emergency
protection of the existing bridge foundation with sheet piles and
concrete, and reconstruction of gabrion check-dam and protection of
bankslope. |
BD
DD, CS |
1993
1994-1996 |
|
Nepal |
JICA |
Kathmandu Valley Urban Transportation Development
Formulation of a master plan to the year 2015 and feasibility study for
selected priority projects in the Kathmandu Valley. |
MP, FS |
1991-1993 |
|
Nepal |
JICA
Government/Grant |
Kathmandu Bus Terminal Construction
Bus terminal complex accommodating medium-and long-distance route buses
and city buses, taxi and private cars.
Site area: 62,200 m2, parking lot (medium-and long-distance
route buses) 124 buses |
BD
DD, CS |
1989-1991
1991-1993 |
|
Nepal |
JICA |
Construction of Sindhuli Road
North-South arterial highway connecting Kathmandu with East-West
Highway, 160 km long, 8 m wide, 2 lanes, 140 bridges, and aftercare study. |
FS
FS Review |
1986-1988
1992-1993 |
|
Nepal |
JICA
Government/Grant |
Bridge Reconstruction in Kathmandu Valley
Reconstruction of 6 bridges among 22 damaged bridges in Kathmandu
Valley. |
BD
DD, CS |
1989-1990
1991-1992 |
|
Pakistan |
Government/JBIC |
Improvement of Indus Highway, Phase-II
Upgrading and rehabilitation of National Highway (total length 568 km). |
CS |
1992-1998 |
|
Pakistan |
JICA
Government/Grant |
North West Frontier Provinces Bridge Construction
Construction and replacement of the new and dilapidated bridges
including the following 11 bridges (867 m in total). |
BD
DD, CS |
1992-1993
1992-1996 |
|
Sri Lanka |
ECFA |
Airport Rail Link From Colombo to Katunayake
Study for a 32 km long modernized railway link between Colombo city to
Bandaranaike International Airport. The project component include
extension and double tracking of the existing line, construction of
stations, procurement of rolling stocks, signaling electrification works,
and O&M Management. |
S |
2001 |
|
Sri Lanka |
JBIC
Government/JBIC |
Baseline Road Improvement and Extension
Rehabilitation and upgrading the existing 8.3 km
Baseline Road between Kelani Tissa Junction and High level Road to a dual
3-lane highway. |
SAPROF
DD, CS (I)
CS (II) |
1992
1994-2000
2000-2001 |
|
Sri Lanka |
JICA |
Bandaranaike International Airport Development Project
- Rehabilitation of Taxiway (93,400 m2)
- Strengthening of apron (13,800 m2)
- Apron Expansion (50,000 m2)
- Improvement of Passenger Terminal Building
- Expansion of Cargo Terminal Building- Modernization of Air Navigation
System
- Improvement of Public Utilities |
DD |
1999-2000 |
|
Sri Lanka |
JICA
Government/JBIC |
Colombo Katunayake Expressway and New Port Access Road Development
Metropolitan highway development between Katunayake international
airport and Colombo port.
Toll expressway: 25.4 km (4 lanes)
Arterial highway: 5.7 km (4 lanes) |
FS
DD |
1982-1984
1991-1992 |
|
Sri Lanka |
JICA
Government/Grant |
Kirinda Fisheries Harbour Construction
Marine and onshore facilities for 3.5-ton class 100 fishing boats. |
FS, BD, DD, CS |
1982-1985 |
|
Sri Lanka |
JICA |
Colombo International Airport Expansion
Runway: 3,350 m x 45 m
Taxiway: 3,368 m x 30 m (converted exit runway)
Apron: 185,250 m2 (expansion)
Buildings: 59,240 m2 (bldg. addition)
Parking area: 49,170 m2 (1,400 cars), and related facilities |
S |
1981 |
|
China |
JBIC |
Follow-up Study for Haikou and Hangzhou Airport
Investigation on environmental and financial management of the two
airports and a survey on procurement procedures. |
S |
2001-2002 |
|
China |
JBIC |
Sustainable Technical Assistance for Fuzhou and Shenzhen International
Airport
Investigation of economical and environmental impact of the project
including procurement and private management issues. |
S |
2000 |
|
China |
JBIC |
Construction of Longdong Dam in Sanjiang Pingyuan in Heilongjian
Province
|
SAPI |
2000 |
|
China |
Government/JBIC |
High Category Operation System for Shanghai Pudong International
Airport Project
Formulation of the Instrument Landing System (ILS) operation manuals
for the basic CAT-III and suggestion the necessary technical requirements,
specifications and drawings resulting from the technical review. |
BD |
1999-2000 |
|
China |
JBIC |
Technical Assistance for the Guangzhou Baiyun International Airport
Relocation Project
Review of existing feasibility study and assessment of economical and
environmental impact.
Taxiway: length 3,800 m, 3,600 m, width 45 m. |
S |
1999-2000 |
|
China |
JICA
Government/JBIC |
Shanghai Pudong International Airport
Airport area 25 km2
Estimated air traffic demand in year 2015: 70 million/year
Estimated air cargo demand in yea 2015: 4.5 million t./year
Annual aircraft movements: 320,000 times
Runway: 4,000 m x 4 |
MP, FS
DD
OM |
1994-1996
1996-1997
1999-2000 |
|
China |
JICA |
Zhejiang Province Road Development
City road network development for short-, medium- and long terms in the
Zhejian Province. (Project target year: 2000, 2010, 2020 respectively)
with the context of the 8th Five-years National Development Plan. |
MP, FS |
1992-1994 |
|
China |
Private Company |
Northeastern China East -West Crossing Superhighway
Superhighway networks in Beijing, Qinhuangdao, Jinzhou, Shenyang,
Dandong and Dalian. |
S |
1990 |
|
China |
JICA |
Dalian Port Development
New Dalian port area development, and the improvement of the existing
Dalian port area up to year 2000.
Commercial port expansion, including two container, berth expansion,
planned shipment of 15 million tons.
Jetty: 50,000 DWT x 2, 30,000 DWT x 2, 20,000 DWT x 4, 15,000 DWT x 2 |
MP, FS |
1987-1988 |
|
China |
JICA |
Shanghai-Nanjing Superhighway
Inter-urban superhighway: 4-6 lanes, 296 km |
FS |
1986-1987 |
|
China |
JICA |
New Qingdao Port Extension
Water supply to new port area
Pipeline: 26.6 km, 20,000 m3/day |
FS |
1984 |
|
Korea |
Nippon Export and Investment Insurance (NEXI) |
Environmental Evaluation Study on Seoul Beltway Project
Review of the existing EIA reports and evaluation of appropriateness of
environmental consideration of the Seoul Beltway Project to be implemented
by private finance.
Length: 36.3 km
Width: 37.8 km, 4 lanes
Bridges: 51
Tunnels: 5
Interchanges: 5
Toll gates: 2 (main route), 4 branch route |
S |
2001-2002 |
|
Korea |
Government/ADB |
Seoul-Inchon Superhighway
Total highway length: 4-lane, 30 km |
DD, CS |
1968-1969 |
|
Algeria |
JICA |
Alger, Oran and Annaba Ports Modernization
Feasibility study for short-term rehabilitation, improvement and
expansion of three major ports.
Project target year: Long-term 2010, Short-term 1997 |
MP, FS |
1991-1993 |
|
Egypt |
JICA
Government/Grant |
Ahmed Hamdi Tunnel Rehabilitation
Rehabilitation of highway tunnel crossing the Suez canal.
Tunnel: L=1,640 m, 10.8 m inner diameter |
BD
DD, CS |
1991-1992
1992-1996 |
|
Iran |
Private Company |
Halileh Port
|
S |
1978 |
|
Jordan |
JICA
Government/Grant |
Construction of King Hussein Bridge
Reconstruction of the bridge along with approach and access roads.
Bridge: 4 lane 110 m long |
BD
DD, CS |
1998-1999
2000-2001 |
|
Jordan |
JICA
Government/Grant |
Construction of King Hussein Bridge and Sheikh Hussein Bridge
Basic design study on two bridges acrossing Jordanian boarder.
Detailed design and construction supervision of Sheik Hussein Bridge
including access road and boarder facilities.
Prestressed concrete continuous box girder type bridge (L=90 m, W=12.1 m)
and access road (L=2.4 km, W=7.6 m). |
BD
DD, CS |
1995
1996-1998 |
|
Morocco |
JICA |
Nador New International Airport
Runway: 2,700 m x 45 m
Taxiway (access taxiway): 227 m x 30 m
Apron: 3 berths, 23,100 m2
Buildings: 6,000 m2
Parking area: 205 cars, 7,200 m2, and related facilities |
FS |
1983-1984 |
|
Oman |
JICA |
Northern Oman Port Development
Review of existing Qaboos port and master plan for new port to be
constructed along Batinah Coast.
Coastline length: 400 km |
MP, FS |
1989-1990 |
|
Syria |
JICA |
Project Formation Study for the Master Plan Study on the Development of
the General Establishment of Syrian Railways
Study on railway facilities planing including railroad stations,
railways networks, and traffic signals. |
S |
1999 |
|
Syria |
JICA |
Ports Development Project
Long and short term ports development up to 2010 including Latakia
port, Tartous port and a new port for bulk cargo. |
MP, FS |
1995-1996 |
|
Tunisia |
JICA
Government/JBIC |
Rades-La Goulette Connecting Bridge
Studies on construction of new bridge connecting Rades and La Goulette
at the mouth of Lake Tunis.
Main Bridge: PC Continuous Extra-dosed Bridge 260 m
Approach Bridge: 900 m
Approach Road: 2,190 m
Rampway Bridge and Road: 540 m & 780 m
North extension Road: 2,250 m |
FS
SAPROF
DD, CS |
1989-1991
1996-1997
2000-2007 |
|
Tunisia |
JBIC |
Electrification of Tunis Suburban Line Project
Review of the project plan of existing feasibility study and
supplemental study to electrify an urban commuter rail line linking Tunis,
capital, with the southern suburbs and arrangement of rail cars. |
SAPROF |
1999-2000 |
|
Turkey |
Government/JBIC |
Bozuyuk-Mekece Road Improvement
Total length: 85.8 km (dual 2-carriageway).
Two Tunnel (twin tubes): L=more than 3 km in total
32 bridges: L=about 2 km in total
Bozuyuk-Mekece Road Improvement Project |
CS |
2001-2007 |
|
Turkey |
JBIC |
Special Assistance for Project Formation for Izmir Port Development
Project
Review on container traffic demand forecast and Izmir port development
plan, establishment of project scope and cost, justification of project
implementation, and review on existing EIA and preparation of TOR for
monitoring system for improvement of existing navigation channel (from 150
m to 250 m in width and from 12 m to 14 m in depth) and container terminal
expansion. |
S |
1998 |
|
Turkey |
JICA |
Port Development at the Sea of Marmara
Formulation of development plan for ports in the Sea of Marmara and new
port at Thrace region up to 2015. |
MP, FS |
1996-1997 |
|
Botswana |
JICA/JICA |
The Feasibility Study on the proposed Kazungula Bridge over the Zambezi
River between the Republic of Botswana and the Republic of Zambia
To formulate development plans for Kazungula bridge across the Zambezi
River between Botswana and Zambia, and to formulate the improvement plans
for border facilities located near the bridge.
To confirm technical & economic feasibility of the optimal development
plans of the bridge.
To promote technical transfer of knowledge and technology. |
FS |
2000-2001 |
|
Cameroon |
Government/JBIC |
Douala Port Container Terminal Modernization
Modernization of container handling facilities including establishment
of operation and maintenance system, organization and tariff system.
Project target year: Short-term 1977, long-term 2005 |
MP, FS
DD, CS |
1990
1990-1993 |
|
Democratic Republic of Congo |
JICA |
Trans Africa Highway Kisangani-Bangassou Road Section
|
MP |
1974-1976 |
|
Democratic Republic of Congo |
Private Company |
Banana Port Development
|
S |
1973 |
|
Ethiopia |
JICA
Government/Grant |
Trunk Road Rehabilitation Project
Rehabilitation of a trunk road (2 lanes, L=299 km) connecting between
Addis Abeba and Debre Marcos. |
BD
DD, CS |
1997-1998
1998-2000 |
|
Ghana |
Government/JBIC |
Achimota-Anyanam Road Rehabilitation Project
To improve the section (Southern 63.3 km) of road between
Achimota-Anyanam by widening, stronger paving, the construction of new
bypass and the replacement of bridge spans.
To strengthen the organization of the Ghana Highway Authority (GHA), the
executing agency in functions such as the planning of road development and
maintenance and the management of contracts. |
CS, DD |
2000-2004 |
|
Ghana |
JICA |
Development Study of Ghana Sea Ports
Formulation of master plan for the development of Tema Port and
Takoradi Port up to the year 2020, making a short-term development and
improvement plan for the Ports to meet demand up to the year 2010, and
identifying institutional development measures and providing an
improvement plan for port management and operation to achieve competitive
operational efficiency. |
MP, FS |
2000-2002 |
|
Ghana |
JBIC |
Anwiankwanta-Yamoransa Road Rehabilitation
The study aims to propose an effective road rehabilitation plan, to
make recommendation to reinforce the rehabilitation planning capacity and
budget planning of the executing agency for its implementation and to
recommend some strategies for better human resources development in the
road sector. |
SAPS |
1998-1999 |
|
Ghana |
JBIC |
Ports Rehabilitation
Evaluation of existing condition of rehabilitated two projects (Tema
and Takoradi) and recommendation on port management improvement. |
SAPS |
|