Country |
Client/Finance |
Project |
Services |
Period |
|
Cambodia |
Government |
Initial Environmental Examination of the Prek Thnot Multipurpose
Project
Conduct of the IEE in respect to natural aspects, and social aspects
such as water quality, aquatic ecosystem, compensation and resettlement
relevant issues.
Preparation of Terms of Reference (TOR) for further Environmental Impact
Assessment (EIA) with the report |
FS |
1994 |
|
Lao PDR |
JICA |
Watershed Management Plan for Forest Conservation in Vangvieng District
Formulation of integrated watershed management plan in Vangvieng
district in order to contribute to the improvement of resources management
and livelihood of the local people. |
MP |
1996-1998 |
|
Myanmar |
JICA |
Study on Integrated Mangrove Management through Community Participation
in the Ayeyawady Delta
Formulation of an Integrated Mangrove Management Plan which aims at the
rehabilitation and sustainable use of the mangrove resources by the local
communities. Transfer of relevant technical skills/knowledge to the
Myanmar Counterpart personnel through en-the-job training during the
course of study. |
MP |
2002-2005 |
|
Thailand |
JBIC |
The Environmental Fund Project
This Fund was established to efficiently meet the financial
requirements of the environmental projects across Thailand. Under the
assistance of ODA loans, 24 solid waste disposal projects and 4 waste
water treatment projects have been formulated and approved as
sub-projects.
This study will draw up a project formulation manual for local
municipalities, which are responsible for sub-project formulation, and
screening guidelines for the Ministry of Science, Technology and
Environment, which is responsible for screening projects. The study will
also make proposals on how to address environmental and social
considerations, and invite personnel for training, in an effort to ensure
that the sub projects are executed accurately. |
SAPI |
2001-2002 |
|
Vietnam |
JBIC
Government/JBIC |
Drainage Project for Environmental Improvement in Hanoi City
Dredging works for 4 major rivers and 4 major lakes, construction of
regulating reservoir (4,000,000m3), 4 water pumping stations
(135m3/s), 2 waste water treatment plants, rehabilitation works
of existing sewerlines, etc. for the mitigation of floods and inundation
in Hanoi City. |
SAPI
DD, CS |
2000
1997-2003 |
|
Vietnam |
JBIC |
Environment and Natural Resources Monitoring System Project
The objective of the Project is to build a Remote Sensing Geographic
Information System appropriate to economic development.(1) To set up the
Ground Station and the Remote Sensing Data Center, which receive and
record data from the satellites, process, achieve and distribute to the
relevant user organizations.(2) To set up the Data Utilization System
installed at each user organization for satellite imagery data utilization
for respective specific applications. |
SAPROF |
2002 |
|
Vietnam |
Private Company |
Environmental Survey for Thang Long Industrial Estate Project
This study was carried out in order to identify potential soil
pollution problem and resulting liability issues at Thang Long Industrial
Estate in Vietnam. The site investigation revealed no significant
pollution, and the result was submitted by the client to Vietnamese
authority as an environmental compliance report in accordance with the
Vietnamese regulation. |
S |
2001 |
|
Vietnam |
JICA |
Study on Environmental Improvement for Hanoi City
Formulation of environmental improvement master plan and strengthening
of institutional system for the implementation of the plan in urban and
sub-urban districts of Hanoi City. Study works include the identification
of priority/urgent environmental projects. |
MP |
1998-2000 |
|
Vietnam |
JICA |
Ha Long Bay Environmental Management
Formulation of environmental management plan for Ha Long Bay area to be
compatible with nature conservation and human activities. |
MP |
1998-1999 |
|
Vietnam |
JICA |
Environmental Project Formation Study
(CIDA Cooperation Project)
General review of environmental problems especially in northern Vietnam
through a series of discussion with Vietnamese government and CIDA,
particularly investigated the environmental issues on water pollution in
Ha Long Bay and solid waste in Hanoi City for formation of urgent
environmental improvement projects. |
FS |
1997 |
|
Vietnam |
Government |
Joint Study on Environmental Cooperation between Viet Nam and Japan
Aim of the study is to establish a guideline for formulating an
environment control or preservation policy in Viet Nam by collecting and
reviewing all available data and information on environmental issues,
discussion and meeting between Vietnamese officials and Japanese
consultant. |
S |
1993-1995 |
|
Indonesia |
JICA |
Special Assistance for Project Sustainability for Kota Panjang
Hydropower Plant and Transmission Line Projects (Phase I and II)
The objectives of the SAPS study are to evaluate the social and
environmental impacts of the hydropower plant and transmission line
projects, collect data for post-evaluation of the projects and to propose
a comprehensive sustainable plan for the affected villages. |
SAPS |
2002 |
| Indonesia |
Directorate General of Water
Resources Development |
Sector Loan For Water Resources
Development II (PTSL II)
PTSL-I was completed in 2000 under financial
assistance from the Government of Japan. Subsequently, the Directorate
General of Water Resources (DGWR) has obtained the Loan Agreement from the
Donor.
The main objectives of the Project are to increase cropping intensity and
farming productivity as well as to improve living standards. The related
objective of the Project is to formulate a framework and standardised
procedures for preparatory works for f 19 sub-projects scattered in Sumatra,
Java, and Kalimantan islands |
PM,CS |
2002-2007 |
| Indonesia |
JBIC |
Bali Beach Conservation Project Additional Design,
Environmental Study
·
Assess the environmental impacts of measures to
replenish eroding beaches in the south of Bali.
·
Devise means to mitigate (reduce to acceptable
levels) any negative environmental impacts.
·
Prepare an Environmental Management Plan
describing how mitigation and monitoring will be carried out, to ensure that
the environment is protected where necessary.
Prepare and submit to Government authorities (BAPEDALDA and
the AMDAL Commission) reports and other documents necessary to obtain
government approval and an environmental permit for the project. |
EIA,EMP |
2001-2002 |
|
Indonesia |
JICA |
Integrated Air Quality Management in Jakarta Metropolitan Area
Preparation of an air pollution central strategy until 2010 in
consideration of socio-economic conditions, and a more concrete action
plan until 2000. |
FS |
1994-1997 |
|
Indonesia |
JICA |
Metropolitan Area Environmental Master Plan
Formulation of a total master plan for the improvement of urban
environment. |
MP |
1994-1995 |
|
Indonesia |
Environment Agency, Japan |
Study on Strategic Response Against Global Warming and Climate Change
Case study on countermeasures for global warming in Indonesia. |
S |
1991-1992 |
|
Malaysia |
JBIC |
The Study for Confirming Environmental Considerations on Electrified
Double-Tracking Railway Project between Rawang-Ipoh
The project aims to 1) Electrification and double-tracking of the
railway between Rawang and Ipoh whose route has a large amount of traffic
in Malaysia and extends about 175 km2) Improvement of
transportation efficiency, safety, and competitive power by introducing a
modernized signing & communication system. |
S |
2000 |
|
Philippines |
JICA |
Watershed Management in Upper Magat and Cagayan River Basin
Formulation a master plan for watershed rehabilitation and management
which based on the result of the natural and socio-economic condition
survey, and the finding of the pilot study conducted in model sties. |
MP |
2001-2002 |
|
Bangladesh |
JBIC |
Rehabilitation of Caustic Soda Factory in Chittagong
Study on environmental pollution measures for pulling down the caustic
soda factory |
S |
1998 |
|
India |
Government/JBIC |
Attappady Wasteland Comprehensive Environmental Conservation Project
Overall project coordination in formulating implementation program,
review of survey and detailed design, preparation of special schemes for
poverty prevention and project monitoring.
Project aims to prevent land degradation through proper forest management,
water resources development and agricultural development, to restore the
wasteland through soil and water conservation measures, and to alleviate
rural poverty through rural infrastructure development. |
PM |
1999-2003 |
|
Nepal |
JICA |
Development of Urban Environmental Strategies in Nepal
Environmental conditions in Katmandu Basin have been deteriorating
rapidly due to urbanization and industrialization. However, effective
approaches to improve the situation have not been identified. In this
Study, a comprehensive review of urban environmental issues in Katmandu
Basin will be made, and strategies to improve urban environment will be
developed. |
S |
2001-2002 |
|
Nepal |
JICA |
Urban Environmental Planning in the Kathmandu Valley in the Kingdom of
Nepal
Technical Assistance to grasp and evaluate environmental conditions and
environmental measures taken.
Also, responsible to propose possible measures for identified
environmental problems and develop its implementation program.
Additionally, responsible to recommend on further cooperation by Japan.
Corresponding to the developed implementation program. |
S |
2001-2002 |
| Nepal |
DFID |
Environmental Due Diligence
Visit selected industries and evaluate the environmental
risks and opportunities associated with the Government of Nepal’s programme
to privatise state-owned-enterprises (SOEs)
Assess the potential for levering environmental improvements in industries
subject to divestment
Liaise with stakeholders to assess the knowledge and awareness of
Environmental Due Diligence (EDD) and its potential as an environmental
management tool, within government and outside· Conduct a training needs
assessment of Government and the Consultancy sector and devise appropriate
courses of training in EDD
Make recommendations for targeted support from the UK Government in the
privatisation process, to improve environmental performance in the
privatised industries. |
EDD |
2001 |
|
Sri Lanka |
JICA |
Study on General Environmental Condition
Study on general environmental condition based on proper environmental
understandings and formulation and charring out Environmental Maintenance
Plan. |
MP |
1995 |
|
China |
JICA |
Study on Basic Design for the Establishment of Environmental
Information Network
Establishment of networks to communicate and share environmental
information gathered at the urban level, including installation of
following equipment.
- Local Area Network (LAN) Equipment (61 cities)
- System Software and Environmental Application Software (61 cities)
- Satelite Telecommunication Equipment (81 cities) |
BD, DD, CS |
2000-2001 |
|
China |
JICA |
Water Resource Development in Shenfu-Dong Sheng Mining Area
Study on water resource development for coal mining
Design of an integrated water use plan covering surface water use and
wastewater re-use plans and feasibility study on the construction of dam,
wastewater treatment/re-use facilities from technical, economic and
environmental points of view. |
MP, FS |
1997-2000 |
|
China |
JICA |
Dalian Environmental Improvement Model Zone Management Project
Integrated environmental management study including water & air
pollution control and institutional development in Dalian environmental
Model Zone (217.24 km2). |
MP, FS |
1996-2000 |
|
China |
JBIC |
SAPI for JBIC Financial Environmental Projects
Special assistance for implementing on-going environmental projects by
disseminating various loan procedures to the Chinese authorities and
improving their environment monitoring system. |
SAPI |
1998-1999 |
|
China |
JICA |
Integrated Management Plan for the Water Environment of Min River in
Chengdu District
Master plan study on the integrated management for the improvement and
restoration of the water environment of the Min River in Chengdu district,
and feasibility study on the selected projects.
Population: 9,600,000
M/I water supply: 2,400 million t/day |
MP, FS |
1996-1997 |
|
China |
IBRD/WB |
Shandong Environmental Project
Design review and advisory services for various schemes for
environmental improvement including wastewater treatment and district
heating system. |
DD |
1996-1997 |
|
China |
JICA |
Project Formulation Study on Future Assistance for Environmental
Management
Project finding and formulation study based on previous study on water
pollution and waste control. |
S |
1995-1996 |
|
Korea |
Nippon Export and Investment Insurance (NEXI) |
Environmental Evaluation Study on Seoul Beltway Project
Review of the existing EIA reports and evaluation of appropriateness of
environmental consideration of the Seoul Beltway Project to be implemented
by private finance.
Length: 36.3 km
Width: 37.8 km, 4 lanes
Bridges: 51
Tunnels: 5
Interchanges: 5
Toll gates: 2 (main route), 4 branch route |
S |
2001-2002 |
|
Korea |
JICA |
Han River System Small and Middle Rivers Environmental Conservation
River management and environmental conservation including improvement
of river structures. |
S |
1989 |
| Egypt |
KfW |
Environmental Planning and
Management for Assiut Barrage
Nippon Koei UK Environment Director to act as the member of the Panel of
Experts (PoE) for Assiut Barrage on the River Nile, responsible for
environmental and social issues of rehabilitation or new construction.
As a PoE member, to provide advice and guidance to RGBS and their
consultants as the project proceeds through feasibility and design to
construction. |
EIA |
2000-ongoing |
| Egypt |
KfW |
Environmental Planning &
Management for the new Naga Hammadi Barrage, River Nile
The Nippon Koei UK Environment Director was appointed as the member of the
Panel of Experts (PoE) responsible for environmental and social issues
related to the design and construction of a new $380 million barrage at Naga
Hammadi.
Two tasks were to be undertaken, as follows:
1. As a PoE member, to provide environmental and social advice and guidance
to RGBS and their consultants as the project proceeds through detailed
design and construction.
2. As a consultant, to undertake a retrospective review of the development
of the Naga Hammadi project, to determine its compliance with the
recommendations of the World Commission on Dams (WCD). |
EIA |
2000-ongoing |
|
Iran |
JICA |
Scope of Works Mission on Drainage and Paddy Field Improvement Project
in Gorgan Plain (Environment)
The aims are to study environmental aspect of the project and to
prepare scope of works (S/W) for JICA in order to conduct coming
feasibility study for drainage facilities protecting paddy fields from
possible salinity. |
S |
2001 |
| Nigeria |
Shell Petroleum Development
Company of Nigeria, Ltd. (SPDC) |
Environmental and Social
Planning and Management of the Oil Industry in the Niger Delta
To assist SPDC in the communication of annual proposals for
their Environmental Programme and Community Development Programme to the
various stakeholder groups in the Niger Delta.
To receive and collate community recommendations on development and
integration of the two programmes.
To prepare workshop materials, updates, the end of workshop Press communiqué
and workshop report. |
EIA |
Annual, on-going |
| Uganda |
DFID |
Environmental Planning &
Management Nippon Koei UK (NKUK) was appointed by DFID to undertake a number
of activities, mainly on behalf of Uganda’s National Environment Management
Authority (NEMA), as follows: 1. Work with NEMA
to mainstream environment and sustainability into the country’s Poverty
Reduction Strategy Paper (PRSP).
2. Work with NEMA to optimise environmental planning and management in the
implementation of Uganda’s Plan for the Modernisation of Agriculture (PMA).
3. Work with NEMA to develop an Environment Sector Development Plan.
4. Work with World Bank missions in Uganda to monitor and supervise NEMA’s
second Environmental Management & Capacity Building Project (EMCBP II).
5. Conduct an Environmental Audit of DFID’s Kampala office. |
EMP |
2000-2002 |
|
Zimbabwe |
JICA |
Water Pollution Control in the Upper Manyame River
Master plan and feasibility study on water quality improvement for
water supply to Harare metropolitan area. |
MP, FS |
1996-1997 |
|
Azerbaijan |
JICA |
Project Formation Study on Environment Sector
Study on urban environmental problem in Baku City to formulate future
technical assistance programs for environmental management project. |
S |
1997 |
|
Kazakhstan |
ECFA |
Project Finding Mission for Environmental Management Plan for the
Northern Caspian Region
Preliminary survey, data collection and analysis for the project. |
S |
2000 |
|
Uzbekistan |
JICA |
Water Quality Monitoring
Review and analysis on data of water qulity, existing facility for
water quality management and related regulations.
Establishment of monitoring system and techical transfer for water quality
management in order to reduce water pollution. |
S |
2002 |
|
Latvia |
JICA |
Study on Environmental Management Plan for Lubana Wetland Complex
Formulation of an environmental management plan for sustainable use of
Lubana Wetland Complex (approximately 78,000 ha), taking into account of
characteristics of the ecosystem, water management, land-use and people's
living. |
MP |
1999-2000 |
|
Latvia |
JICA |
Project Formation Study on Environment Sector
Study on urban environmental problem in Latvia to formulate future
technical assistance programs in environmental sector. |
S |
1998 |
|
Romania |
JICA |
Study on Water Environmental Management in the Prahova River Basin
Preliminary survey on institution and environmental database to conduct
the long-term study on Water Environmental Management in the Prahova River
Basin. |
S |
1997 |
| Europe
& USA |
Japanese Government Cabinet
Office |
Research on Master Planning
Collection and review of information on the approach to
Master Planning of major infrastructure in the UK, Germany, France and the
USA;
Fields of research included transportation, environmental protection, social
infrastructure and natural resources;
For each country a summary of:
- General background information;
- The system for developing public service infrastructure or facilities;
- The mechanism through which the Government formulates its Master Plan in
each field of service. |
MP |
2001 |
| UK |
Chichester Harbour Conservancy
Board |
West Sussex Structure Plan;
Strategic Environmental Assessment
Collection and review of existing information on nature conservation,
hydrology, water quality and flood risk in the east of Chichester Harbour
and the surrounding land;
Assessment at a strategic level the potential impacts upon the above of an
LOC1 proposal in the draft West Sussex Structure Plan for the development of
750 homes to the south west of Chichester, close to Chichester Harbour;
Assessment of the impacts of two development alternatives in each of four
potential locations and indicate which development and location(s) are
preferred;
Development of mitigation for adverse impacts and potential environmental
enhancements where appropriate. |
SEA |
2002 |
| UK |
DFID |
Environmental Training for
DFID Engineering and Natural Resources Advisers
Preparation and delivery of presentation on Strategic Environmental
Assessment (SEA) and Environmental Due Diligence (EDD) and their use as
environmental management tools;
Training in the theory and practice of SEA and EDD, drawing on actual
examples from developing countries, related to transport, energy, urban or
infrastructure sectors;
Preparation of case study workshops for each technique, completed by
delegates as group exercises. |
SEA,EDD |
2001 |
| Brazil |
Confidential |
Expert Witness in Marine
Fouling Case Examination of underwater
photographs of fouled vessel and identify the species of barnacle present;
Examination of other documents related to the case including divers’
inspection report, vessel voyage log, correspondence between lawyers, etc;
Provision of Expert Opinion and Report on likelihood of barnacles having
settled on the hull of the vessel and grown to the size claimed by the
owners, during a lay-up period off the port of Sepetiba in Brazil;
Review and provision of a written opinion on reports produced by the Expert
engaged by the vessel owners, from the British Museum (Natural History). |
EW |
2001 |
|
Cuba |
JICA |
Remediation of Oil Contaminated Sediment in Havana Bay
Havana Bay in Cuba is one of the most polluted bays in the world, and
its clean up, in particular removal and treatment of oil-contaminated
sediment, has a high priority. In this project, the extent of pollution
will be identified, and various approaches to clean up Havana Bay will be
explored. Capacity development is one of the prime goals of the Study, and
the expert will work closely with Cuban environmental experts to develop
effective remediation technologies. |
S |
2001-2002 |
| El
Salvador |
JICA |
Detailed Design of Port
Reactivation Project in La Union Province: Environmental Study
Planning and supervision of marine environmental surveys
throughout the project site;
Review of Environmental Permit, granted by the El Salvador Ministry of
Environment and Natural Resources;
Identification of the requirements of the Environmental Mitigation and
Monitoring Measures specified in the Permit;
Derivation of mechanism for incorporating mitigation measures in the port
design;
Preparation of Environmental Management Plan describing the Mitigation
Measures and Environmental Permit Conditions, the manner in which they will
be achieved and the Environmental Monitoring that will be conducted to
ensure that mitigation is effective in reducing the impacts of the
development. |
S, EMP |
2001-2 |
|
Panama |
JICA |
Study on Solid Waste Management Plan for Municipality of Panama in the
Republic of Panama
The objective of the study was to design and formulate a Master Plan
project for solid waste management for Municipality of Panama. The project
also includes a feasibility study on priority project which will be
selected from the M/P. Development of effective environmental management
institution was one of the key issues addressed in the Study. |
S |
2001 |
| Worldwide |
Conservation International/Shell
International Ltd |
A Guide to the Management of
Biodiversity within Hydrocarbon Site Selection
The processes of exploration and production related to the identification
and exploitation of hydrocarbon resources have the potential for impacts on
the environment, including biodiversity.
Nippon Koei UK was appointed by the Site Selection Group of the Energy and
Biodiversity Initiative (EBI) to develop guidance which will enable the
potential impacts on biodiversity to be identified at all of the stages of
the resource development process.
The guidance will be reviewed by key stakeholders in the oil industry and
conservation community, and following joint agreement, will be adopted as
the normal procedure to be applied when considering entry into any proposed
new site for exploration or production. |
EMP |
2002 |