List of Experience in Environmental Assignments

Country

Client/Finance

Project

Services

Period

Cambodia

Government

Initial Environmental Examination of the Prek Thnot Multipurpose Project

Conduct of the IEE in respect to natural aspects, and social aspects such as water quality, aquatic ecosystem, compensation and resettlement relevant issues.
Preparation of Terms of Reference (TOR) for further Environmental Impact Assessment (EIA) with the report

FS

1994

Lao PDR

JICA

Watershed Management Plan for Forest Conservation in Vangvieng District

Formulation of integrated watershed management plan in Vangvieng district in order to contribute to the improvement of resources management and livelihood of the local people.

MP

1996-1998

Myanmar

JICA

Study on Integrated Mangrove Management through Community Participation in the Ayeyawady Delta

Formulation of an Integrated Mangrove Management Plan which aims at the rehabilitation and sustainable use of the mangrove resources by the local communities. Transfer of relevant technical skills/knowledge to the Myanmar Counterpart personnel through en-the-job training during the course of study.

MP

2002-2005

Thailand

JBIC

The Environmental Fund Project

This Fund was established to efficiently meet the financial requirements of the environmental projects across Thailand. Under the assistance of ODA loans, 24 solid waste disposal projects and 4 waste water treatment projects have been formulated and approved as sub-projects.
This study will draw up a project formulation manual for local municipalities, which are responsible for sub-project formulation, and screening guidelines for the Ministry of Science, Technology and Environment, which is responsible for screening projects. The study will also make proposals on how to address environmental and social considerations, and invite personnel for training, in an effort to ensure that the sub projects are executed accurately.

SAPI

2001-2002

Vietnam

JBIC
Government/JBIC

Drainage Project for Environmental Improvement in Hanoi City

Dredging works for 4 major rivers and 4 major lakes, construction of regulating reservoir (4,000,000m3), 4 water pumping stations (135m3/s), 2 waste water treatment plants, rehabilitation works of existing sewerlines, etc. for the mitigation of floods and inundation in Hanoi City.

SAPI
DD, CS

2000
1997-2003

Vietnam

JBIC

Environment and Natural Resources Monitoring System Project

The objective of the Project is to build a Remote Sensing Geographic Information System appropriate to economic development.(1) To set up the Ground Station and the Remote Sensing Data Center, which receive and record data from the satellites, process, achieve and distribute to the relevant user organizations.(2) To set up the Data Utilization System installed at each user organization for satellite imagery data utilization for respective specific applications.

SAPROF

2002

Vietnam

Private Company

Environmental Survey for Thang Long Industrial Estate Project

This study was carried out in order to identify potential soil pollution problem and resulting liability issues at Thang Long Industrial Estate in Vietnam. The site investigation revealed no significant pollution, and the result was submitted by the client to Vietnamese authority as an environmental compliance report in accordance with the Vietnamese regulation.

S

2001

Vietnam

JICA

Study on Environmental Improvement for Hanoi City

Formulation of environmental improvement master plan and strengthening of institutional system for the implementation of the plan in urban and sub-urban districts of Hanoi City. Study works include the identification of priority/urgent environmental projects.

MP

1998-2000

Vietnam

JICA

Ha Long Bay Environmental Management

Formulation of environmental management plan for Ha Long Bay area to be compatible with nature conservation and human activities.

MP

1998-1999

Vietnam

JICA

Environmental Project Formation Study
(CIDA Cooperation Project)

General review of environmental problems especially in northern Vietnam through a series of discussion with Vietnamese government and CIDA, particularly investigated the environmental issues on water pollution in Ha Long Bay and solid waste in Hanoi City for formation of urgent environmental improvement projects.

FS

1997

Vietnam

Government

Joint Study on Environmental Cooperation between Viet Nam and Japan

Aim of the study is to establish a guideline for formulating an environment control or preservation policy in Viet Nam by collecting and reviewing all available data and information on environmental issues, discussion and meeting between Vietnamese officials and Japanese consultant.

S

1993-1995

Indonesia

JICA

Special Assistance for Project Sustainability for Kota Panjang Hydropower Plant and Transmission Line Projects (Phase I and II)

The objectives of the SAPS study are to evaluate the social and environmental impacts of the hydropower plant and transmission line projects, collect data for post-evaluation of the projects and to propose a comprehensive sustainable plan for the affected villages.

SAPS

2002

Indonesia Directorate General of Water Resources Development Sector Loan For Water Resources Development II (PTSL II)
PTSL-I was completed in 2000 under financial assistance from the Government of Japan. Subsequently, the Directorate General of Water Resources (DGWR) has obtained the Loan Agreement from the Donor.
The main objectives of the Project are to increase cropping intensity and farming productivity as well as to improve living standards. The related objective of the Project is to formulate a framework and standardised procedures for preparatory works for f 19 sub-projects scattered in Sumatra, Java, and Kalimantan islands
PM,CS 2002-2007
Indonesia JBIC

Bali Beach Conservation Project Additional Design, Environmental Study

·       Assess the environmental impacts of measures to replenish eroding beaches in the south of Bali.

·       Devise means to mitigate (reduce to acceptable levels) any negative environmental impacts.

·       Prepare an Environmental Management Plan describing how mitigation and monitoring will be carried out, to ensure that the environment is protected where necessary.

Prepare and submit to Government authorities (BAPEDALDA and the AMDAL Commission) reports and other documents necessary to obtain government approval and an environmental permit for the project.

EIA,EMP 2001-2002

Indonesia

JICA

Integrated Air Quality Management in Jakarta Metropolitan Area

Preparation of an air pollution central strategy until 2010 in consideration of socio-economic conditions, and a more concrete action plan until 2000.

FS

1994-1997

Indonesia

JICA

Metropolitan Area Environmental Master Plan

Formulation of a total master plan for the improvement of urban environment.

MP

1994-1995

Indonesia

Environment Agency, Japan

Study on Strategic Response Against Global Warming and Climate Change

Case study on countermeasures for global warming in Indonesia.

S

1991-1992

Malaysia

JBIC

The Study for Confirming Environmental Considerations on Electrified Double-Tracking Railway Project between Rawang-Ipoh

The project aims to 1) Electrification and double-tracking of the railway between Rawang and Ipoh whose route has a large amount of traffic in Malaysia and extends about 175 km2) Improvement of transportation efficiency, safety, and competitive power by introducing a modernized signing & communication system.

S

2000

Philippines

JICA

Watershed Management in Upper Magat and Cagayan River Basin

Formulation a master plan for watershed rehabilitation and management which based on the result of the natural and socio-economic condition survey, and the finding of the pilot study conducted in model sties.

MP

2001-2002

Bangladesh

JBIC

Rehabilitation of Caustic Soda Factory in Chittagong

Study on environmental pollution measures for pulling down the caustic soda factory

S

1998

India

Government/JBIC

Attappady Wasteland Comprehensive Environmental Conservation Project

Overall project coordination in formulating implementation program, review of survey and detailed design, preparation of special schemes for poverty prevention and project monitoring.
Project aims to prevent land degradation through proper forest management, water resources development and agricultural development, to restore the wasteland through soil and water conservation measures, and to alleviate rural poverty through rural infrastructure development.

PM

1999-2003

Nepal

JICA

Development of Urban Environmental Strategies in Nepal

Environmental conditions in Katmandu Basin have been deteriorating rapidly due to urbanization and industrialization. However, effective approaches to improve the situation have not been identified. In this Study, a comprehensive review of urban environmental issues in Katmandu Basin will be made, and strategies to improve urban environment will be developed.

S

2001-2002

Nepal

JICA

Urban Environmental Planning in the Kathmandu Valley in the Kingdom of Nepal

Technical Assistance to grasp and evaluate environmental conditions and environmental measures taken.
Also, responsible to propose possible measures for identified environmental problems and develop its implementation program.
Additionally, responsible to recommend on further cooperation by Japan.
Corresponding to the developed implementation program.

S

2001-2002

Nepal DFID Environmental Due Diligence

Visit selected industries and evaluate the environmental risks and opportunities associated with the Government of Nepal’s programme to privatise state-owned-enterprises (SOEs)
Assess the potential for levering environmental improvements in industries subject to divestment
Liaise with stakeholders to assess the knowledge and awareness of Environmental Due Diligence (EDD) and its potential as an environmental management tool, within government and outside· Conduct a training needs assessment of Government and the Consultancy sector and devise appropriate courses of training in EDD
Make recommendations for targeted support from the UK Government in the privatisation process, to improve environmental performance in the privatised industries.

EDD 2001

Sri Lanka

JICA

Study on General Environmental Condition

Study on general environmental condition based on proper environmental understandings and formulation and charring out Environmental Maintenance Plan.

MP

1995

China

JICA

Study on Basic Design for the Establishment of Environmental Information Network

Establishment of networks to communicate and share environmental information gathered at the urban level, including installation of following equipment.
- Local Area Network (LAN) Equipment (61 cities)
- System Software and Environmental Application Software (61 cities)
- Satelite Telecommunication Equipment (81 cities)

BD, DD, CS

2000-2001

China

JICA

Water Resource Development in Shenfu-Dong Sheng Mining Area

Study on water resource development for coal mining
Design of an integrated water use plan covering surface water use and wastewater re-use plans and feasibility study on the construction of dam, wastewater treatment/re-use facilities from technical, economic and environmental points of view.

MP, FS

1997-2000

China

JICA

Dalian Environmental Improvement Model Zone Management Project

Integrated environmental management study including water & air pollution control and institutional development in Dalian environmental Model Zone (217.24 km2).

MP, FS

1996-2000

China

JBIC

SAPI for JBIC Financial Environmental Projects

Special assistance for implementing on-going environmental projects by disseminating various loan procedures to the Chinese authorities and improving their environment monitoring system.

SAPI

1998-1999

China

JICA

Integrated Management Plan for the Water Environment of Min River in Chengdu District

Master plan study on the integrated management for the improvement and restoration of the water environment of the Min River in Chengdu district, and feasibility study on the selected projects.
Population: 9,600,000
M/I water supply: 2,400 million t/day

MP, FS

1996-1997

China

IBRD/WB

Shandong Environmental Project

Design review and advisory services for various schemes for environmental improvement including wastewater treatment and district heating system.

DD

1996-1997

China

JICA

Project Formulation Study on Future Assistance for Environmental Management

Project finding and formulation study based on previous study on water pollution and waste control.

S

1995-1996

Korea

Nippon Export and Investment Insurance (NEXI)

Environmental Evaluation Study on Seoul Beltway Project

Review of the existing EIA reports and evaluation of appropriateness of environmental consideration of the Seoul Beltway Project to be implemented by private finance.
Length: 36.3 km
Width: 37.8 km, 4 lanes
Bridges: 51
Tunnels: 5
Interchanges: 5
Toll gates: 2 (main route), 4 branch route

S

2001-2002

Korea

JICA

Han River System Small and Middle Rivers Environmental Conservation

River management and environmental conservation including improvement of river structures.

S

1989

Egypt KfW Environmental Planning and Management for Assiut Barrage
Nippon Koei UK Environment Director to act as the member of the Panel of Experts (PoE) for Assiut Barrage on the River Nile, responsible for environmental and social issues of rehabilitation or new construction.
As a PoE member, to provide advice and guidance to RGBS and their consultants as the project proceeds through feasibility and design to construction.
EIA 2000-ongoing
Egypt KfW Environmental Planning & Management for the new Naga Hammadi Barrage, River Nile
The Nippon Koei UK Environment Director was appointed as the member of the Panel of Experts (PoE) responsible for environmental and social issues related to the design and construction of a new $380 million barrage at Naga Hammadi.
Two tasks were to be undertaken, as follows:
1. As a PoE member, to provide environmental and social advice and guidance to RGBS and their consultants as the project proceeds through detailed design and construction.
2. As a consultant, to undertake a retrospective review of the development of the Naga Hammadi project, to determine its compliance with the recommendations of the World Commission on Dams (WCD).
EIA 2000-ongoing

Iran

JICA

Scope of Works Mission on Drainage and Paddy Field Improvement Project in Gorgan Plain (Environment)

The aims are to study environmental aspect of the project and to prepare scope of works (S/W) for JICA in order to conduct coming feasibility study for drainage facilities protecting paddy fields from possible salinity.

S

2001

Nigeria Shell Petroleum Development Company of Nigeria, Ltd. (SPDC) Environmental and Social Planning and Management of the Oil Industry in the Niger Delta

To assist SPDC in the communication of annual proposals for their Environmental Programme and Community Development Programme to the various stakeholder groups in the Niger Delta.
To receive and collate community recommendations on development and integration of the two programmes.
To prepare workshop materials, updates, the end of workshop Press communiqué and workshop report.

EIA Annual, on-going
Uganda DFID Environmental Planning & Management Nippon Koei UK (NKUK) was appointed by DFID to undertake a number of activities, mainly on behalf of Uganda’s National Environment Management Authority (NEMA), as follows:

1. Work with NEMA to mainstream environment and sustainability into the country’s Poverty Reduction Strategy Paper (PRSP).
2. Work with NEMA to optimise environmental planning and management in the implementation of Uganda’s Plan for the Modernisation of Agriculture (PMA).
3. Work with NEMA to develop an Environment Sector Development Plan.
4. Work with World Bank missions in Uganda to monitor and supervise NEMA’s second Environmental Management & Capacity Building Project (EMCBP II).
5. Conduct an Environmental Audit of DFID’s Kampala office.

EMP 2000-2002

Zimbabwe

JICA

Water Pollution Control in the Upper Manyame River

Master plan and feasibility study on water quality improvement for water supply to Harare metropolitan area.

MP, FS

1996-1997

Azerbaijan

JICA

Project Formation Study on Environment Sector

Study on urban environmental problem in Baku City to formulate future technical assistance programs for environmental management project.

S

1997

Kazakhstan

ECFA

Project Finding Mission for Environmental Management Plan for the Northern Caspian Region

Preliminary survey, data collection and analysis for the project.

S

2000

Uzbekistan

JICA

Water Quality Monitoring

Review and analysis on data of water qulity, existing facility for water quality management and related regulations.
Establishment of monitoring system and techical transfer for water quality management in order to reduce water pollution.

S

2002

Latvia

JICA

Study on Environmental Management Plan for Lubana Wetland Complex

Formulation of an environmental management plan for sustainable use of Lubana Wetland Complex (approximately 78,000 ha), taking into account of characteristics of the ecosystem, water management, land-use and people's living.

MP

1999-2000

Latvia

JICA

Project Formation Study on Environment Sector

Study on urban environmental problem in Latvia to formulate future technical assistance programs in environmental sector.

S

1998

Romania

JICA

Study on Water Environmental Management in the Prahova River Basin

Preliminary survey on institution and environmental database to conduct the long-term study on Water Environmental Management in the Prahova River Basin.

S

1997

Europe  & USA Japanese Government Cabinet Office Research on Master Planning

Collection and review of information on the approach to Master Planning of major infrastructure in the UK, Germany, France and the USA;
Fields of research included transportation, environmental protection, social infrastructure and natural resources;
For each country a summary of:
- General background information;
- The system for developing public service infrastructure or facilities;
- The mechanism through which the Government formulates its Master Plan in each field of service.

MP 2001
UK Chichester Harbour Conservancy Board West Sussex Structure Plan; Strategic Environmental Assessment

Collection and review of existing information on nature conservation, hydrology, water quality and flood risk in the east of Chichester Harbour and the surrounding land;
Assessment at a strategic level the potential impacts upon the above of an LOC1 proposal in the draft West Sussex Structure Plan for the development of 750 homes to the south west of Chichester, close to Chichester Harbour;
Assessment of the impacts of two development alternatives in each of four potential locations and indicate which development and location(s) are preferred;
Development of mitigation for adverse impacts and potential environmental enhancements where appropriate.
SEA 2002
UK DFID Environmental Training for DFID Engineering and Natural Resources Advisers

Preparation and delivery of presentation on Strategic Environmental Assessment (SEA) and Environmental Due Diligence (EDD) and their use as environmental management tools;
Training in the theory and practice of SEA and EDD, drawing on actual examples from developing countries, related to transport, energy, urban or infrastructure sectors;
Preparation of case study workshops for each technique, completed by delegates as group exercises.

SEA,EDD 2001
Brazil Confidential Expert Witness in Marine Fouling Case

Examination of underwater photographs of fouled vessel and identify the species of barnacle present;
Examination of other documents related to the case including divers’ inspection report, vessel voyage log, correspondence between lawyers, etc;
Provision of Expert Opinion and Report on likelihood of barnacles having settled on the hull of the vessel and grown to the size claimed by the owners, during a lay-up period off the port of Sepetiba in Brazil;
Review and provision of a written opinion on reports produced by the Expert engaged by the vessel owners, from the British Museum (Natural History).

EW 2001

Cuba

JICA

Remediation of Oil Contaminated Sediment in Havana Bay

Havana Bay in Cuba is one of the most polluted bays in the world, and its clean up, in particular removal and treatment of oil-contaminated sediment, has a high priority. In this project, the extent of pollution will be identified, and various approaches to clean up Havana Bay will be explored. Capacity development is one of the prime goals of the Study, and the expert will work closely with Cuban environmental experts to develop effective remediation technologies.

S

2001-2002

El Salvador JICA Detailed Design of Port Reactivation Project in La Union Province: Environmental Study

Planning and supervision of marine environmental surveys throughout the project site;
Review of Environmental Permit, granted by the El Salvador Ministry of Environment and Natural Resources;
Identification of the requirements of the Environmental Mitigation and Monitoring Measures specified in the Permit;
Derivation of mechanism for incorporating mitigation measures in the port design;
Preparation of Environmental Management Plan describing the Mitigation Measures and Environmental Permit Conditions, the manner in which they will be achieved and the Environmental Monitoring that will be conducted to ensure that mitigation is effective in reducing the impacts of the development.

S, EMP 2001-2

Panama

JICA

Study on Solid Waste Management Plan for Municipality of Panama in the Republic of Panama

The objective of the study was to design and formulate a Master Plan project for solid waste management for Municipality of Panama. The project also includes a feasibility study on priority project which will be selected from the M/P. Development of effective environmental management institution was one of the key issues addressed in the Study.

S

2001

Worldwide Conservation International/Shell International Ltd A Guide to the Management of Biodiversity within Hydrocarbon Site Selection

The processes of exploration and production related to the identification and exploitation of hydrocarbon resources have the potential for impacts on the environment, including biodiversity.
Nippon Koei UK was appointed by the Site Selection Group of the Energy and Biodiversity Initiative (EBI) to develop guidance which will enable the potential impacts on biodiversity to be identified at all of the stages of the resource development process.
The guidance will be reviewed by key stakeholders in the oil industry and conservation community, and following joint agreement, will be adopted as the normal procedure to be applied when considering entry into any proposed new site for exploration or production.

EMP 2002

[Client/Finance]

[Services]

JICA

:

Japan International Cooperation Agency

S

:

Studies

JBIC (OECF)

:

Japan Bank for International Cooperation

MP

:

Master Plan

Grant

:

Japanese Grant

FS

:

Feasibility Study

IBRD

:

International Bank for Reconstruction and Development

SAPROF

:

Special Assistance for Project Formation

WB

:

The World Bank

SAPI

:

Special Assistance for Project Implementation

ADB

:

Asian Development Bank

SAPS

:

Special Assistance for Project Sustainability

UN

:

United Nations

D

:

Design

UNDP

:

United Nations Development Program

BD

:

Basic Design

UNIDO

:

United Nations Industrial Development Organization

DD

:

Detailed Design

IDA

:

International Development Association

CS

:

Construction Supervision

FAO

:

Food and Agriculture Organization

OM

:

Operation and Maintenance

JETRO

:

Japan External Trade Organization

PM

:

Project Management

ADCA

:

Agricultural Development Consultants Association, Japan

EIA

 :

Environmental Impact Assessment

ECFA

:

Engineering Consultant Firms Association, Japan

EMP

 :

Environmental Management Plan

IDI

:

Infrastructure Development Institute, Japan

EW

 :

Expert Witness

KfW

:

Kreditanstalt für Wiederaufbau

SEA

 :

Strategic Environmental Assessment

DFID

:

UK Department for International Development

EDD

 :

Environmental Due Diligence

DANIDA

:

Danish Ministry of Foreign Affairs

TR

 :

Technical Review

*Finance source appears when the source is different from the client.